Operator comparison
HostDime vs Tecto Data Centers
Both columns come from the facilities each operator publishes and Coloprice tracks: HostDime — 8 facilities in 4 countries, Tecto Data Centers — 9 facilities in 2 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.
HostDime
8
Tracked facilities · Countries: 4
Where they operate: Brazil, Colombia, Mexico, United States
Tecto Data Centers
9
Tracked facilities · Countries: 2
Where they operate: Brazil, Colombia
Portfolios side by side
| Field | HostDime | Tecto Data Centers |
|---|---|---|
| Tracked facilities | 8 | 9 |
| Countries | 4 | 2 |
| Cities | 7 | 5 |
| Published IT capacity | 16 MW (3 of 8 sites publish) | 244 MW (4 of 9 sites publish) |
| Operational | 8 | 7 |
| Under construction / announced | 0 | 2 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 1 |
| Most common certifications | PCI, SOC 2 Type II, Tier III Design Certified by Uptime Institute, Uptime Institute Tier IV Certification of Design Documents | not published |
| Average Coloprice Score | 29/100 across 8 scored sites | 17/100 across 9 scored sites |
| Awards and badges | 6 | 4 |
| Highest-scored facility | HostDime Cotia (São Paulo) (54/100) | Tecto TFOR3 (Mega Lobster) (34/100) |
Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: HostDime — 8; Tecto Data Centers — 9
- Countries: HostDime — 4; Tecto Data Centers — 2
- Cities: HostDime — 7; Tecto Data Centers — 5
- Published IT capacity: HostDime — 16 MW (3 of 8 sites publish); Tecto Data Centers — 244 MW (4 of 9 sites publish)
- Operational: HostDime — 8; Tecto Data Centers — 7
- Under construction / announced: HostDime — 0; Tecto Data Centers — 2
- AI-ready sites: HostDime — 0; Tecto Data Centers — 1
- Average Coloprice Score: HostDime — 29/100 across 8 scored sites; Tecto Data Centers — 17/100 across 9 scored sites
- Awards and badges: HostDime — 6; Tecto Data Centers — 4
- Highest-scored facility: HostDime — HostDime Cotia (São Paulo) (54/100); Tecto Data Centers — Tecto TFOR3 (Mega Lobster) (34/100)
Published for only one side: Most common certifications.
Highest-scored facility
HostDime
HostDime Cotia (São Paulo)
Cotia, Brazil · 5.9 MW · 54/100
Tecto Data Centers
Tecto TFOR3 (Mega Lobster)
Fortaleza, Brazil · 20 MW · 34/100
Open HostDime profile →Open Tecto Data Centers profile →
Other comparisons
Aligned Data Centers vs HostDimeHostDime vs InterNexaAligned Data Centers vs Tecto Data CentersInterNexa vs Tecto Data Centers