14 facilities · 9 operators · 86 MW tracked
Colocation in Bengaluru: pricing, providers and capacity
9 operators run 14 tracked data centers in Bengaluru (13 operational, 86+ MW published, 0 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Bengaluru?
9 operators run 14 tracked data centers in Bengaluru; the largest by sites is Nxtra Data (3). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Bengaluru publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Bengaluru
Operators with tracked data centers in Bengaluru, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Nxtra Data | 3 / 3 | 25 | Nxtra Bengaluru 2 (Hoskote) | not published | — |
| NTT Global Data Centers | 3 / 2 | 17 | NTT Bengaluru 3 Data Center | not published | — |
| ST Telemedia Global Data Centres (India) | 2 / 2 | 5 | STT Bengaluru 2 | not published | — |
| STT GDC India | 1 / 1 | 18 | STT Bengaluru DC 3 | IGBC Green Building | — |
| CtrlS Datacenters | 1 / 1 | 13 | CtrlS Bengaluru Data Center | LEED Platinum v4 O+M | — |
| Sify Technologies | 1 / 1 | 5 | Sify Bengaluru Data Center | TIA-942-B Rated-3, ISO 27001:2022, ISO 20000-1:2018 | — |
| Iron Mountain | 1 / 1 | 4 | Iron Mountain BLR-1 | Tier III design | — |
| ESDS Software Solution | 1 / 1 | not published | ESDS Data Center, Electronic City, Bengaluru | ANSI/TIA-942-B Facility - Rated 3 | — |
| NxtGen Datacenter & Cloud Technologies | 1 / 1 | not published | NxtGen High Density Datacenter (HDDC) | ANSI/TIA-942-C Rated 3 Constructed Facility | — |
Availability in Bengaluru: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Bengaluru?
By tracked sites: Nxtra Data with 3. By published IT capacity: Nxtra Data with 25 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Bengaluru, including some that do not sell space.
Is there colocation capacity available in Bengaluru right now?
Coloprice tracks 14 facilities here (13 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Bengaluru?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Bengaluru
One brief, several operators with capacity in Bengaluru, India, same terms. Independent — no operator pays for position.
Colocation in Bengaluru? One brief, several quotes.
Request quotes →