16 facilities · 8 operators · 121 MW tracked
Colocation in Querétaro: pricing, providers and capacity
8 operators run 16 tracked data centers in Querétaro (15 operational, 121+ MW published, 0 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Querétaro?
8 operators run 16 tracked data centers in Querétaro; the largest by sites is Ascenty (Digital Realty) (3). There is no city-level benchmark for Querétaro; the closest published wholesale figure is Querétaro at $260 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$260 /kW·mo
Querétaro · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
Published retail prices
No operator in Querétaro publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Querétaro
Operators with tracked data centers in Querétaro, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Ascenty (Digital Realty) | 3 / 3 | 81 | Ascenty Querétaro 1 | not published | — |
| Digital Realty | 3 / 3 | not published | Digital Realty MEX01 | SOC 1, SOC 2, SOC 3 | — |
| KIO Networks | 2 / 2 | 40 | KIO QRO|1 (El Marqués) | ISO/IEC 20000-1, ISO/IEC 27001, ISO/IEC 27017 | — |
| Alestra | 2 / 2 | not published | Alestra Green Data Center (Querétaro 2) | ICREA – Data Center del Mundo, ICREA Gobernabilidad Nivel Alfa, CEEDA | — |
| Aligned Data Centers | 2 / 2 | not published | Aligned QR-01 (Querétaro) | not published | — |
| Equinix | 2 / 2 | not published | Equinix MX1 IBX | not published | — |
| Scala Data Centers | 1 / 0 | not published | Scala Querétaro campus (SQROQT01-04) | not published | — |
| Triara (Telmex) | 1 / 1 | not published | Triara Data Center Querétaro (Bunker 12) | ANSI/TIA-942-C Constructed Facility - Rated 4, EPI DCOS:2021 Maturity Level 5 | — |
Availability in Querétaro: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Querétaro?
By tracked sites: Ascenty (Digital Realty) with 3. By published IT capacity: Ascenty (Digital Realty) with 81 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Querétaro, including some that do not sell space.
Is there colocation capacity available in Querétaro right now?
Coloprice tracks 16 facilities here (15 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Querétaro?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Querétaro benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Querétaro
One brief, several operators with capacity in Querétaro, Mexico, same terms. Independent — no operator pays for position.
Colocation in Querétaro? One brief, several quotes.
Request quotes →