5 facilities · 5 operators · 1 MW tracked
Colocation in Boston: pricing, providers and capacity
5 operators run 5 tracked data centers in Boston (5 operational, 1+ MW published, 0 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Boston?
5 operators run 5 tracked data centers in Boston; the largest by sites is DataBank (1). There is no city-level benchmark for Boston; the closest published wholesale figure is North America (avg) at $196 per kW per month (CBRE, North America Data Center Trends H2 2025, H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$196 /kW·mo
North America (avg) · CBRE, North America Data Center Trends H2 2025 · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
Published retail prices
No operator in Boston publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Boston
Operators with tracked data centers in Boston, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| DataBank | 1 / 1 | 1 | DataBank BOS1 | not published | — |
| CoreSite | 1 / 1 | not published | CoreSite BO1 | not published | — |
| Digital Realty | 1 / 1 | not published | Digital Realty BOS14 | not published | — |
| FirstLight | 1 / 1 | not published | FirstLight Rockland Data Center | SOC 2, HIPAA, PCI DSS | — |
| Markley Group | 1 / 1 | not published | Markley Group — One Summer Street | not published | — |
Availability in Boston: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Boston?
By tracked sites: DataBank with 1. By published IT capacity: DataBank with 1 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Boston, including some that do not sell space.
Is there colocation capacity available in Boston right now?
Coloprice tracks 5 facilities here (5 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Boston?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the North America (avg) benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Boston
One brief, several operators with capacity in Boston, United States, same terms. Independent — no operator pays for position.
Colocation in Boston? One brief, several quotes.