7 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Boston: 7 facilities, colocation pricing
Colocation pricing and providers in Boston →
How many data centers are in Boston?
Coloprice tracks 7 data centers in Boston, United States: 7 operational, 0 under construction and 0 announced, run by 7 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 1+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Boston, United States | · · · | $0.117 | 7 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| Japan | $280 | $0.185 | 133 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Boston?
Coloprice tracks 7 data centers in Boston, United States: 7 operational, 0 under construction and 0 announced, run by 7 operators.
Which operators run data centers in Boston?
By number of facilities tracked: DataBank (1), CoreSite (1), Markley Group (1), Digital Realty (1), FirstLight (1).
What is the total data center power capacity in Boston?
Facilities that publish capacity add up to 1 MW (1 of 7 sites disclose a figure); the largest published site is DataBank BOS1 with 0.5 MW.
How much does colocation cost in Boston, United States?
No published wholesale $/kW benchmark exists for Boston, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Boston, United States?
Commercial electricity in Boston, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Boston, United States?
Boston, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Boston, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| DataBank BOS1 | DataBank | 0.5 | — | Operational |
| CoreSite BO1 | CoreSite | — | — | Operational |
| Markley Group — One Summer Street | Markley Group | — | — | Operational |
| Digital Realty BOS14 | Digital Realty | — | — | Operational |
| FirstLight Rockland Data Center | FirstLight | — | — | Operational |
| Compass Datacenters Iron Mountain Data Centers BOS I | Compass Datacenters | — | III | Operational |
| Iron Mountain Data Centers Boston Data Center I | Iron Mountain | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
United States
Colocation quotes in Boston: free, reply within one business day
Get Quotes →