2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Yerevan: 2 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.122
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Yerevan, Armenia | · · · | $0.122 | 2 | — |
| Kazakhstan | · · · | $0.086 | 14 | — |
| Ukraine | · · · | $0.185 | 5 | — |
| Moldova | · · · | $0.175 | 1 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Yerevan, Armenia?
No published wholesale $/kW benchmark exists for Yerevan, Armenia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Yerevan, Armenia?
Commercial electricity in Yerevan, Armenia is $0.122 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Yerevan, Armenia?
On power alone, Kazakhstan ($0.086/kWh) run below Yerevan, Armenia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Yerevan, Armenia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Ucom Colocation Data Center | Ucom LLC | — | — | Operational |
| Viva Data Center | Viva Armenia CJSC | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.