NEXTDC P2 Perth CBD
OperationalNEXTDC P2 Perth CBD is a data center (Uptime Tier IV, operations certified) in Perth (CBD), Australia, operated by NEXTDC, with 20 MW of published IT capacity, currently operational.
NEXTDC P2 is an operational 20 MW data centre in Perth (CBD).

- Operator
- NEXTDC
- City
- Perth (CBD), Australia
- Power, MW
- 20 MW
- Cooling
- Air
- Uptime Tier
- IV · operations certified
- Floor space
- 12,000 m²
- Racks
- 6,300
- Market benchmark
- $188 per kW per month wholesale · Australia
- Index rate for the market, not this operator’s price list
3 sources · last checked 2026-10-08 · data pending on-site verification
Coloprice Score
80 out of 100
Class A · #2 of 168 in Australia
- Resilience35/35
- Compliance17/20
- Transparency10/20
- Scale11/15
- Maturity7/10
Connectivity: 52 networks and 3 internet exchanges are present in this facility.
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
NEXTDC P2 is a Tier IV data centre in the Perth CBD, described by the operator as the only facility in Western Australia holding both Tier IV design and constructed certifications. NEXTDC lists 12,000 m² of technical space, 20 MW or more of IT capacity and a capacity of 6,300 racks. The site sits at the gateway to Perth's submarine cable systems and offers local cloud on-ramps for Microsoft and AWS, plus managed and unmanaged interconnects to the P1 Malaga facility at 1 and 10 Gb/s. Power is N+1 with N+N at rack level on an isolated parallel bus, using a 1.5 MW Piller rotary UPS with Penske engines. Cooling combines Stulz indirect free-cooling CRAC units, hot-aisle containment with a cold-flooded room, N+2 CRAC units per data hall, 24 hours of water storage and a peak design heat load of 4,000 W/m². Certifications listed include ISO 9001, 14001, 45001, 27001, SOC 1 and 2 Type II and PCI DSS, plus Tier IV Gold for Operational Sustainability. No street address is published on the page.
- ▮12,000 m² of technical space, 20 MW+ of IT capacity and 6,300-rack capacity, per NEXTDC.
- ▮Tier IV design and constructed facility certification, plus Tier IV Gold for Operational Sustainability.
- ▮Peak design heat load of 4,000 W/m² and N+2 CRAC units per data hall.
- ▮Local cloud on-ramps for Microsoft and AWS and a position at the gateway to Perth's submarine cables.
Colocation pricing: Australia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Perth (CBD): free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Compare with nearby facilities
| Facility | Operator | Power, MW | Tier | Status | km |
|---|---|---|---|---|---|
| NEXTDC P2 Perth CBD | NEXTDC | 20 | IV | Operational | 0 |
| Vocus Data Centre Perth | Vocus | — | — | Operational | 1 |
| QV.1 Perth | CBRE Managing Agent | — | — | Operational | 2 |
| Equinix PE2 | Equinix | — | — | Operational | 7 |
| NEXTDC P1 Malaga | NEXTDC | 10 | III | Operational | 10 |
| Fujitsu Malaga | Fujitsu | — | — | Operational | 10 |
Source — Verified against operator sources · data pending on-site verification