15 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Perth: 15 facilities, colocation pricing
Colocation pricing and providers in Perth →
How many data centers are in Perth?
Coloprice tracks 15 data centers in Perth, Australia: 14 operational, 0 under construction and 1 announced, run by 12 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.252
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 7 Tier III/IV · 2 AI-ready · 230+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Perth (Malaga), Australia | · · · | $0.252 | 15 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Japan | $280 | $0.185 | 133 | — |
| Indonesia | · · · | $0.063 | 204 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Perth?
Coloprice tracks 15 data centers in Perth, Australia: 14 operational, 0 under construction and 1 announced, run by 12 operators.
Which operators run data centers in Perth?
By number of facilities tracked: Equinix (3), NEXTDC (2), CDC Data Centres (1), FrontierDC (1), Fujitsu (1).
What is the total data center power capacity in Perth?
Facilities that publish capacity add up to 230 MW (3 of 15 sites disclose a figure); the largest published site is CDC Maddington Campus with 200 MW.
How much does colocation cost in Perth (Malaga), Australia?
No published wholesale $/kW benchmark exists for Perth (Malaga), Australia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 15 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Perth (Malaga), Australia?
Commercial electricity in Perth (Malaga), Australia is $0.252 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 15 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Perth (Malaga), Australia?
On power alone, Japan ($0.185/kWh), Indonesia ($0.063/kWh) run below Perth (Malaga), Australia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Perth (Malaga), Australia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Perth (Malaga) vs SydneyMelbourne (Tullamarine) vs Perth (Malaga)Brisbane (CBD) vs Perth (Malaga)
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NEXTDC P1 Malaga | NEXTDC | 10 | III | Operational |
| NEXTDC P2 Perth CBD | NEXTDC | 20 | IV | Operational |
| CDC Maddington Campus | CDC Data Centres | 200 | — | Announced |
| RCWA1 Data Centre | FrontierDC | — | III | Operational |
| Malaga Data Centre | Fujitsu | — | IV | Operational |
| DC Two Bibra Lake | DC Two | — | III | Operational |
| Pier DC Pl1 | Pier DC | — | III | Operational |
| Equinix PE1 | Equinix | — | — | Operational |
| Equinix PE2 | Equinix | — | — | Operational |
| Equinix PE3 | Equinix | — | — | Operational |
| DUG Perth Data Centre | DUG Technology | — | — | Operational |
| NEXION Networks Perth data centre | NEXION Networks | — | — | Operational |
| Vocus Data Centre Perth | Vocus | — | — | Operational |
| Metronode Perth 2 Data Centre, Stage 1 | Metronode | — | III | Operational |
| QV.1 Perth | CBRE Managing Agent | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Australia
Colocation quotes in Perth: free, reply within one business day
Get Quotes →