▮▮Coloprice
← Denmark

5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Ballerup: 5 facilities, colocation pricing

Colocation pricing and providers in Ballerup →

How many data centers are in Ballerup?

Coloprice tracks 5 data centers in Ballerup, Denmark: 5 operational, 0 under construction and 0 announced, run by 3 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.286

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 30+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Ballerup, Denmark· · ·$0.2865—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Ballerup?

Coloprice tracks 5 data centers in Ballerup, Denmark: 5 operational, 0 under construction and 0 announced, run by 3 operators.

Which operators run data centers in Ballerup?

By number of facilities tracked: Digital Realty (Interxion) (3), atNorth (1), Cibicom A/S (1).

What is the total data center power capacity in Ballerup?

Facilities that publish capacity add up to 30 MW (1 of 5 sites disclose a figure); the largest published site is atNorth DEN01 Copenhagen Metro Site with 30 MW.

How much does colocation cost in Ballerup, Denmark?

No published wholesale $/kW benchmark exists for Ballerup, Denmark yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Ballerup, Denmark?

Commercial electricity in Ballerup, Denmark is $0.286 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Ballerup, Denmark?

On power alone, Germany ($0.269/kWh) run below Ballerup, Denmark. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Ballerup, Denmark market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Ballerup vs CopenhagenBallerup vs Skanderborg

Data centers

FacilityOperatorPower, MWTierStatus
CPH1Digital Realty (Interxion)——Operational
CPH2Digital Realty (Interxion)——Operational
CPH3Digital Realty (Interxion)——Operational
atNorth DEN01 Copenhagen Metro SiteatNorth30—Operational
Cibicom Datacenter BallerupCibicom A/S——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.