13 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Copenhagen: 13 facilities, colocation pricing
Colocation pricing and providers in Copenhagen →
How many data centers are in Copenhagen?
Coloprice tracks 13 data centers in Copenhagen, Denmark: 12 operational, 1 under construction and 0 announced, run by 12 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.286
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 1 AI-ready · 73+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Copenhagen, Denmark | · · · | $0.286 | 13 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Copenhagen?
Coloprice tracks 13 data centers in Copenhagen, Denmark: 12 operational, 1 under construction and 0 announced, run by 12 operators.
Which operators run data centers in Copenhagen?
By number of facilities tracked: Vaultica (2), Digital Realty (Interxion) (1), STACK Infrastructure (1), Aeven (1), Kolo (1).
What is the total data center power capacity in Copenhagen?
Facilities that publish capacity add up to 73 MW (2 of 13 sites disclose a figure); the largest published site is STACK COP02 with 72 MW.
How much does colocation cost in Copenhagen, Denmark?
No published wholesale $/kW benchmark exists for Copenhagen, Denmark yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 13 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Copenhagen, Denmark?
Commercial electricity in Copenhagen, Denmark is $0.286 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 13 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Copenhagen, Denmark?
On power alone, Germany ($0.269/kWh) run below Copenhagen, Denmark. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Copenhagen, Denmark market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Ballerup vs CopenhagenCopenhagen vs Skanderborg
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| CPH-RS | Digital Realty (Interxion) | — | — | Operational |
| STACK COP02 | STACK Infrastructure | 72 | — | Under construction |
| Vaultica COP01A | Vaultica | 1.2 | — | Operational |
| Aeven BA1P | Aeven | — | III | Operational |
| Kolo DK5 Copenhagen | Kolo | — | — | Operational |
| Global Connect Copenhagen | Global Connect | — | — | Operational |
| TeliaSonera Copenhagen | Colt | — | — | Operational |
| Telia Telehouse Copenhagen | Norlys Digital | — | — | Operational |
| Siminn Hosting | Siminn Hosting | — | — | Operational |
| Cibicom Datacenter CPH West | Cibicom A/S | — | — | Operational |
| GlobalConnect Vesterbro (CPH2) | GlobalConnect Group | — | — | Operational |
| Vaultica Data Centers | COP01 | Vaultica | — | — | Operational |
| Penta Infra Copenhagen CPH01 | Penta C.V. | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Copenhagen: free, reply within one business day