Coloprice tracks 6 data centers in Tallinn, Estonia: 6 operational, 0 under construction and 0 announced, run by 5 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.167
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 4+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Tallinn, Estonia | · · · | $0.167 | 6 | — |
| Latvia | · · · | $0.178 | 19 | — |
| Finland | · · · | $0.105 | 31 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Tallinn?
Coloprice tracks 6 data centers in Tallinn, Estonia: 6 operational, 0 under construction and 0 announced, run by 5 operators.
Which operators run data centers in Tallinn?
By number of facilities tracked: Telia Company (2), Infonet DC OÜ (1), CITIC Telecom CPC (1), Elisa (1), Aktsiaselts WaveCom (1).
What is the total data center power capacity in Tallinn?
Facilities that publish capacity add up to 4 MW (1 of 6 sites disclose a figure); the largest published site is Infonet DC with 4 MW.
How much does colocation cost in Tallinn, Estonia?
No published wholesale $/kW benchmark exists for Tallinn, Estonia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Tallinn, Estonia?
Commercial electricity in Tallinn, Estonia is $0.167 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Tallinn, Estonia?
On power alone, Finland ($0.105/kWh) run below Tallinn, Estonia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Tallinn, Estonia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Infonet DC | Infonet DC OÜ | 4 | — | Operational |
| CITIC Telecom CPC DataHOUSE@Tallinn | CITIC Telecom CPC | — | — | Operational |
| Elisa Eesti Data Center | Elisa | — | — | Operational |
| Telia Telehouse KJJ | Telia Company | — | — | Operational |
| WaveCom DC | Aktsiaselts WaveCom | — | — | Operational |
| Telia Telehouse MUS | Telia Company | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Estonia
Colocation quotes in Tallinn: free, reply within one business day
Get Quotes →