▮▮Coloprice
← Estonia

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Harku: 1 facilities, colocation pricing

How many data centers are in Harku?

Coloprice tracks 1 data centers in Harku, Estonia: 1 operational, 0 under construction and 0 announced, run by 1 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.167

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 18+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Harku (Tallinn area), Estonia· · ·$0.1671—
Latvia· · ·$0.17819—
Finland· · ·$0.10531—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Harku?

Coloprice tracks 1 data centers in Harku, Estonia: 1 operational, 0 under construction and 0 announced, run by 1 operators.

Which operators run data centers in Harku?

By number of facilities tracked: Greenergy Data Centers (1).

What is the total data center power capacity in Harku?

Facilities that publish capacity add up to 18 MW (1 of 1 sites disclose a figure); the largest published site is Greenergy Data Centers with 18 MW.

How much does colocation cost in Harku (Tallinn area), Estonia?

No published wholesale $/kW benchmark exists for Harku (Tallinn area), Estonia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Harku (Tallinn area), Estonia?

Commercial electricity in Harku (Tallinn area), Estonia is $0.167 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Harku (Tallinn area), Estonia?

On power alone, Finland ($0.105/kWh) run below Harku (Tallinn area), Estonia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Harku (Tallinn area), Estonia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
Greenergy Data CentersGreenergy Data Centers18—Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.