Portus Data Centers MUC2

Under construction

Marsstraße 5, 85551 Kirchheim bei München, Germany

Portus Data Centers MUC2 is a data center in Kirchheim bei München, near Munich, Germany, operated by Portus Data Centers (Portus Data Centers Muenchen GmbH), with 5.5 MW of published IT capacity, currently under construction.

Portus Data Centers' MUC2, a new AI- and HPC-ready data center under construction on the operator's Munich-area campus, targeting 5.5 MW of critical IT load with liquid cooling and first capacity due in early 2027.

Portus Data Centers MUC2 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Portus Data Centers (Portus Data Centers Muenchen GmbH)
City
Kirchheim bei München, near Munich, Germany
Power, MW
5.5 MW
Cooling
Liquid
Floor space
2,200 m²
AI-ready
Yes
E

Coloprice Score

25 out of 100

Class E · #61 of 109 in Germany

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Portus Data Centers MUC2 — Coloprice Score 25
<a href="https://coloprice.com/data-centers/germany/munich/portus-data-centers-muc2-munich/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/portus-data-centers-muc2-munich.svg"
    alt="Portus Data Centers MUC2 — Coloprice Score 25" height="64">
</a>

MUC2 is a new carrier-neutral data center under construction on Portus Data Centers' Munich-area campus in Kirchheim bei München, next to the operator's existing MUC1 facility, with a groundbreaking ceremony attended by Bavarian deputy minister-president Hubert Aiwanger and Portus CEO Falk Weinreich. The operator targets ready-for-service in the first quarter of 2027, with 5.5 MW of critical IT load across 2,200 m² of white space spread over two floors, four standby generators and a redundant grid connection. Portus is designing the facility specifically for AI and HPC workloads, including ultra-high-density racks using liquid cooling, and targets a PUE of 1.2 or lower on 100% renewable power. As with the operator's other sites, marketing language describing the facility as a 'TIER 3' data center reflects Portus's own design intent rather than a completed Uptime Institute certification, since the building is still under construction.

  • Under construction, targeted ready-for-service Q1 2027
  • 5.5 MW critical IT load planned, 2,200 m² over two floors
  • Purpose-built for AI/HPC with liquid cooling, up to ultra-high rack densities
  • Target PUE ≤1.2, 100% renewable power

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Kirchheim bei München, near Munich

Source — Verified against operator sources · data pending on-site verification