▮▮Coloprice
← Germany

15 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Munich: 15 facilities, colocation pricing

Colocation pricing and providers in Munich →

How many data centers are in Munich?

Coloprice tracks 15 data centers in Munich, Germany: 14 operational, 1 under construction and 0 announced, run by 12 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.269

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 28+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Munich, Germany· · ·$0.26915—
Netherlands$180$0.179130—
United Kingdom$213$0.454196—
France$190$0.173186—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Munich?

Coloprice tracks 15 data centers in Munich, Germany: 14 operational, 1 under construction and 0 announced, run by 12 operators.

Which operators run data centers in Munich?

By number of facilities tracked: NTT Global Data Centers (2), NorthC (2), Portus Data Centers (Portus Data Centers Muenchen GmbH) (2), noris network AG (1), EdgeConneX (1).

What is the total data center power capacity in Munich?

Facilities that publish capacity add up to 28 MW (7 of 15 sites disclose a figure); the largest published site is NTT Munich 2 Data Center with 14 MW.

How much does colocation cost in Munich, Germany?

No published wholesale $/kW benchmark exists for Munich, Germany yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 15 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Munich, Germany?

Commercial electricity in Munich, Germany is $0.269 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 15 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Munich, Germany?

On power alone, Netherlands ($0.179/kWh), France ($0.173/kWh) run below Munich, Germany. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Munich, Germany market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Frankfurt vs MunichHamburg vs MunichBerlin vs Munich

Data centers

FacilityOperatorPower, MWTierStatus
NTT Munich 1 Data CenterNTT Global Data Centers1—Operational
NTT Munich 2 Data CenterNTT Global Data Centers14—Operational
NorthC Munich 1NorthC2—Operational
NorthC Munich 2NorthC1.17—Operational
noris network München Ostnoris network AG——Operational
Portus Data Centers MUC1Portus Data Centers (Portus Data Centers Muenchen GmbH)1.5—Operational
Portus Data Centers MUC2Portus Data Centers (Portus Data Centers Muenchen GmbH)5.5—Under construction
EdgeConneX MunichEdgeConneX2.4—Operational
EMC Home of Data MUC IEMC Home of Data——Operational
Equinix MU1Equinix——Operational
euNetworks Colocation Muenchen 1euNetworks Group——Operational
SpaceNet (LA)SpaceNet——Operational
Arelion Munich MCNArelion——Operational
Global Crossing MunichColt Technology Services Group——Operational
KPN Datacenter (Mchn-S1)KPN EuroRings——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.