STT Palava 1

Under construction

Palava, Thane district, Maharashtra

STT Palava 1 is a data center in Mumbai (Palava), India, operated by ST Telemedia Global Data Centres (India), with 50 MW of published IT capacity, currently under construction.

New STT GDC India campus breaking ground in Palava, between Thane and Navi Mumbai, with an initial 50 MW phase and a long-term design target of about 400 MW.

STT Palava 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
ST Telemedia Global Data Centres (India)
City
Mumbai (Palava), India
Power, MW
50 MW
Cooling
Air
AI-ready
Yes

Coloprice Score

22 out of 100

limited data · #72 of 125 in India

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
STT Palava 1 — Coloprice Score 22
<a href="https://coloprice.com/data-centers/india/mumbai/stt-gdc-palava-mumbai/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/stt-gdc-palava-mumbai.svg"
    alt="STT Palava 1 — Coloprice Score 22" height="64">
</a>

STT GDC India marked the groundbreaking of its third Mumbai-area campus in March 2026, this time in Palava, the Lodha-developed township sitting between Thane and Navi Mumbai. The site covers roughly 46 acres and is designed to scale toward approximately 400 MW of IT load over time, with a first phase bringing 50 MW online. The project sits under a wider memorandum ST Telemedia signed with the Maharashtra government covering up to INR 5,000 crore (about USD 540 million) of investment across the operator's Mumbai and Pune data center parks, expected to generate more than 500 direct jobs and roughly 2,000 indirect roles regionally. STT GDC frames Palava as purpose-built for AI and high-density computing, adding a third Mumbai-region location alongside its existing campuses and continuing an India expansion that already spans Chennai, Hyderabad and other metros under similar state-government MoUs. No completion date for the first phase had been published at groundbreaking, and detailed cooling and certification specifications were not yet disclosed. STT GDC's own live locations page confirms this building as "STT Palava 1" — the first of what are now three numbered buildings disclosed for the campus (Palava 4 and Palava 5 have since appeared on the operator's site at 60.5 MW each). Campus acreage is reported inconsistently across STT GDC's own materials: its Maharashtra MoU newsroom page cites just over 27 acres, while trade press describes roughly 46 acres — the two figures have not been reconciled.

  • 46-acre campus in Palava, between Thane and Navi Mumbai — STT GDC India's third Mumbai-area site
  • 50 MW first phase, designed to scale to ~400 MW long-term
  • Part of an INR 5,000 crore (~USD 540M) Maharashtra investment MoU
  • Positioned for AI and high-density computing workloads
  • Officially named "STT Palava 1" per the operator's locations page; two further buildings (Palava 4, 5) have since been listed at 60.5 MW each

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Mumbai (Palava)

Source — Verified against operator sources · data pending on-site verification