Sify Rabale Data Center Campus (Tower 5)
OperationalRabale, Navi Mumbai, Maharashtra, India
Sify Rabale Data Center Campus (Tower 5) is a data center (TIA-942 Rated 3, certified) in Navi Mumbai, India, operated by Sify Technologies, with 43 MW of published IT capacity, currently operational.
AI-ready hyperscale campus in Rabale designed for 12 towers and 377+ MW, whose newly launched 43+ MW Tower 5 was the first in India certified by NVIDIA as DGX-ready for air and liquid cooling.

- Operator
- Sify Technologies
- City
- Navi Mumbai, India
- Power, MW
- 43 MW
- Cooling
- Liquid
- TIA-942 Rated
- 3 · certified
- Max density
- 130 kW/rack
- AI-ready
- Yes
Coloprice Score
62 out of 100
Class C · #4 of 167 in India
- Resilience20/35
- Compliance11/20
- Transparency9/20
- Scale15/15
- Maturity7/10
Connectivity: 50 networks and 4 internet exchanges are present in this facility. Source: PeeringDB →
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Sify's Rabale campus in Navi Mumbai is being built out as one of India's largest AI-focused colocation estates: twelve towers are planned, five are operational with roughly 97 MW of IT power, and the newly launched Tower 5 alone contributes 43.2 MW. Tower 5 was the first data center in India to earn NVIDIA's DGX-Ready certification covering liquid cooling, and the campus supports both air and liquid cooling at densities above 130 kW per rack. Power arrives via an on-premises 110 kV substation for the first three towers and a 220 kV GIS substation for towers four through six, with 99 MW of contracted solar and wind generation available for green supply. The site is rated to TIA-942-B Rated 3 and certified to ISO 27001, ISO 20000-1, PCI DSS v4 and SSAE18 SOC 2 Type 2, with K4-rated perimeter security and ten levels of access control. Four diverse fiber entry paths serve the campus, which targets hyperscalers, cloud providers and enterprises deploying GPU infrastructure at scale; towers 6, 7, 11 and 12 are slated to come online by 2026.
- ▮Tower 5 adds 43.2 MW to a ~97 MW campus
- ▮India's first NVIDIA DGX-Ready certification for liquid cooling
- ▮Supports 130+ kW per rack
- ▮12-tower campus with 220 kV on-site GIS substation
- ▮99 MW of contracted solar and wind power
Colocation pricing: India & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Navi Mumbai
Source — Verified against operator sources · data pending on-site verification