▮▮Coloprice

AdaniConneX Noida

Under construction

AdaniConneX Noida is a data center in Noida, India, operated by AdaniConneX, with 150 MW of published IT capacity, currently under construction.

150 MW hyperscale data center campus in Noida, part of AdaniConneX's Delhi-NCR expansion, with Phase 1 reported live since January 2025 and up to 100% renewable power.

AdaniConneX Noida — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction

6 of 14 fields published · Operator? Add or correct data →

Units
Operator
AdaniConneX
City
Noida, India
Power, MW
150 MW
Cooling
Air
Opened
2025

1 sources · data pending on-site verification

—

Coloprice Score

20 out of 100

limited data · #172 of 306 in India

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
AdaniConneX Noida — Coloprice Score 20
<a href="https://coloprice.com/data-centers/india/noida/adaniconnex-noida-1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/adaniconnex-noida-1.svg"
    alt="AdaniConneX Noida — Coloprice Score 20" height="64">
</a>

AdaniConneX lists its Noida campus as a 150 MW potential IT-load facility in the Delhi NCR region, noting that Noida, together with Gurgaon, is one of the emerging IT hubs of the area. The operator's data centre page states that Phase 1 went live in January 2025, that the facility is designed for 99.999% availability and that renewable energy supply can reach up to 100%. The 150 MW figure is potential capacity at full build-out, not installed load; the operator does not publish how much of it is energised today. Address, floor area, rack count, rack density, cooling design and third-party certifications are not published on the page, so those fields are left empty. The catalog status remains construction because only the first phase is reported live and later phases are still being delivered.

  • ▮Potential IT capacity of 150 MW, per the operator.
  • ▮Phase 1 reported live in January 2025.
  • ▮Designed for 99.999% availability, a design target rather than a certificate.
  • ▮Renewable supply of up to 100% is stated; no actual share is published.
  • ▮Address and certifications are not published.

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Noida

FacilityOperatorPower, MWTierStatus
AdaniConneX NoidaAdaniConneX150—Under construction
NTT Noida 1 Data CenterNTT Global Data Centers1.5—Operational
NTT Noida 2 Data CenterNTT Global Data Centers52.8—Under construction
Iron Mountain NCR-1Iron Mountain12III*Operational
STT Noida 1ST Telemedia Global Data Centres (India)17—Operational
STT Noida 2ST Telemedia Global Data Centres (India)22—Under construction

Source — Verified against operator sources · data pending on-site verification