12 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Noida: 12 facilities, colocation pricing

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.122

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 1 AI-ready · 343+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Noida, India· · ·$0.12212
United Arab Emirates· · ·$0.11054
Singapore$403$0.27033
United Kingdom· · ·$0.44281

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How much does colocation cost in Noida, India?

No published wholesale $/kW benchmark exists for Noida, India yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 12 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Noida, India?

Commercial electricity in Noida, India is $0.122 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 12 facilities in our catalog, 4 of them announced or under construction.

Where is colocation cheaper near Noida, India?

On power alone, United Arab Emirates ($0.110/kWh) run below Noida, India. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Noida, India market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
NTT Noida 1 Data CenterNTT Global Data Centers1.5Operational
NTT Noida 2 Data CenterNTT Global Data Centers52.8Under construction
Iron Mountain NCR-1Iron Mountain12III*Operational
STT Noida 1ST Telemedia Global Data Centres (India)17Operational
STT Noida 2ST Telemedia Global Data Centres (India)22Under construction
STT Noida 3ST Telemedia Global Data Centres (India)28Under construction
Sify Noida 02Sify Technologies25.923Operational
CtrlS Noida Data CenterCtrlS Datacenters84Operational
AdaniConneX NoidaAdaniConneX150Under construction
Nxtra NCR 1 (Noida Sector 62)Nxtra Data4.5Operational
Nxtra NCR 2 (Noida Sector 81)Nxtra Data3.5Operational
Nxtra NCR 4 (Noida)Nxtra Data18Operational