21 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Noida: 21 facilities, colocation pricing
Colocation pricing and providers in Noida →
How many data centers are in Noida?
Coloprice tracks 21 data centers in Noida, India: 16 operational, 5 under construction and 0 announced, run by 15 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.109
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 6 Tier III/IV · 2 AI-ready · 376+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Noida, India | · · · | $0.109 | 21 | — |
| United Arab Emirates | · · · | $0.110 | 56 | — |
| Singapore | $403 | $0.270 | 60 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Noida?
Coloprice tracks 21 data centers in Noida, India: 16 operational, 5 under construction and 0 announced, run by 15 operators.
Which operators run data centers in Noida?
By number of facilities tracked: ST Telemedia Global Data Centres (India) (3), Nxtra Data (3), NTT Global Data Centers (2), Iron Mountain (2), Sify Technologies (1).
What is the total data center power capacity in Noida?
Facilities that publish capacity add up to 376 MW (14 of 21 sites disclose a figure); the largest published site is AdaniConneX Noida with 150 MW.
How much does colocation cost in Noida, India?
No published wholesale $/kW benchmark exists for Noida, India yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 21 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Noida, India?
Commercial electricity in Noida, India is $0.109 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 21 facilities in our catalog, 5 of them announced or under construction.
Where is colocation cheaper near Noida, India?
Noida, India sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Noida, India market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NTT Noida 1 Data Center | NTT Global Data Centers | 1.5 | — | Operational |
| NTT Noida 2 Data Center | NTT Global Data Centers | 52.8 | — | Under construction |
| Iron Mountain NCR-1 | Iron Mountain | 12 | III* | Operational |
| STT Noida 1 | ST Telemedia Global Data Centres (India) | 17 | — | Operational |
| STT Noida 2 | ST Telemedia Global Data Centres (India) | 22 | — | Under construction |
| STT Noida 3 | ST Telemedia Global Data Centres (India) | 28 | — | Under construction |
| Sify Noida 02 | Sify Technologies | 25.92 | 3 | Operational |
| CtrlS Noida Data Center | CtrlS Datacenters | 8 | 4 | Operational |
| AdaniConneX Noida | AdaniConneX | 150 | — | Under construction |
| Nxtra NCR 1 (Noida Sector 62) | Nxtra Data | 4.5 | — | Operational |
| Nxtra NCR 2 (Noida Sector 81) | Nxtra Data | 3.5 | — | Operational |
| Nxtra NCR 4 (Noida) | Nxtra Data | 18 | — | Operational |
| Techno Digital Noida | Techno Digital (Techno Electric) | 30 | — | Under construction |
| Iron Mountain NCR-2 | Iron Mountain | 2.8 | — | Operational |
| ESDS - STPI Noida Data Center | ESDS Software Solution | — | — | Operational |
| Centre for Development of Advanced Computing (C-DAC) Anant | Centre for Development of Advanced Computing (C-DAC) | — | III | Operational |
| Sify-NOIDA02-Tower B-L1, L2 and L8 | Sify Infinit Spaces | — | 3 | Operational |
| AnG India | AnG India | — | 3 | Operational |
| Netmagic Noida | NTTCINS | — | — | Operational |
| Web Werks NCR 2 | Web Werks DataCenter | — | — | Operational |
| NIXI Noida Netmagic | National Internet Exchange of India | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
India
Colocation quotes in Noida: free, reply within one business day
Get Quotes →