▮▮Coloprice

Echelon DUB20 (Arklow)

Under construction

Avoca River Business Park, Arklow, Co. Wicklow

Echelon DUB20 (Arklow) is a data center in Arklow, Ireland, operated by Echelon Data Centres, currently under construction.

Data centre campus at Avoca River Business Park in Arklow, part of Echelon's 4.2 billion euro Wicklow investment, hosting Ireland's first Green Energy Park with construction due to complete by 2028.

Echelon DUB20 (Arklow) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Echelon Data Centres
City
Arklow, Ireland
Power, MW
Cooling
Air

Coloprice Score

5 out of 100

limited data · #26 of 26 in Ireland

  • Resilience0/35
  • Compliance0/20
  • Transparency2/20
  • Scale0/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Echelon DUB20 (Arklow) — Coloprice Score 5
<a href="https://coloprice.com/data-centers/ireland/arklow/echelon-dub20-arklow/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/echelon-dub20-arklow.svg"
    alt="Echelon DUB20 (Arklow) — Coloprice Score 5" height="64">
</a>

Energy infrastructure is the defining feature of DUB20, the campus Echelon Data Centres is building on the former Irish Fertiliser Industries site at Avoca River Business Park in Arklow, Co. Wicklow. Branded as Ireland's first Green Energy Park, the development pairs the data centre with a joint 220kV substation built with SSE Renewables that will give the site access to up to 800MW of offshore wind from the Arklow Bank Wind Park, alongside on-site solar PV rated to generate over 6,000MWh a year, battery storage and HVO-fuelled backup. The campus was designed for a 90MW IT load, with a planning application lodged to expand this to 204MW, and forms part of a 4.2 billion euro investment across Echelon's Wicklow projects. Two on-site energy centres allow DUB20 to manage its own supply and export power back to the national grid at peak demand. Construction is due to complete by 2028, targeting hyperscale and large-footprint tenants seeking capacity outside the constrained Dublin metro grid.

  • Ireland's first Green Energy Park, part of a 4.2 billion euro Echelon investment in Co. Wicklow
  • Designed for 90MW IT load with planning lodged to expand to 204MW
  • Joint 220kV substation with SSE Renewables gives access to up to 800MW of offshore wind
  • On-site solar PV (6,000+ MWh/year), battery storage and HVO backup; can export power to the grid
  • Construction due to complete by 2028

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Arklow

Source — Verified against operator sources · data pending on-site verification