Echelon DUB30 (Kish)

Under construction

Kish Business Park, Oakdale, Co. Wicklow, Ireland

Echelon DUB30 (Kish) is a data center in Arklow, Ireland, operated by Echelon Data Centres, currently under construction.

Second Wicklow campus at Kish Business Park, about 5 km from Echelon's DUB20, designed for a 90 MW first phase rising to 150 MW total IT capacity.

Echelon DUB30 (Kish) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Echelon Data Centres
City
Arklow, Ireland
Power, MW
Cooling
Air
AI-ready
Yes

Coloprice Score

7 out of 100

limited data · #22 of 23 in Ireland

  • Resilience0/35
  • Compliance0/20
  • Transparency2/20
  • Scale2/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Echelon DUB30 (Kish) — Coloprice Score 7
<a href="https://coloprice.com/data-centers/ireland/arklow/echelon-dub30-kish/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/echelon-dub30-kish.svg"
    alt="Echelon DUB30 (Kish) — Coloprice Score 7" height="64">
</a>

DUB30 is the second of Echelon Data Centres' two County Wicklow campuses, located at Kish Business Park roughly 5 km from the operator's DUB20 site in Arklow. The 60-acre site is designed to deliver 150MW of total IT capacity, with Phase 1 covering 90MW of IT load across three buildings and a further 60MW of pipeline land held for a future planning application. DUB30 is planned to share direct power and fibre ducts with the neighbouring DUB20 campus, and Echelon has applied for a 110kV substation connection to support it, pending approval. Together, DUB20 and DUB30 form part of Echelon's roughly 3.5 billion euro investment across its Wicklow projects, aimed at hyperscale and large-footprint tenants who need capacity outside Dublin's constrained metro grid, backed by more than 1GW of renewable energy — including offshore wind — available in the surrounding area.

  • Designed for 150MW total IT capacity; 90MW in Phase 1 across three buildings
  • 60-acre site at Kish Business Park, ~5km from sibling campus DUB20
  • Planned 110kV substation connection (pending approval)
  • Part of Echelon's ~3.5 billion euro Co. Wicklow investment programme
  • Over 1GW of renewable energy, including offshore wind, available locally

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Arklow

Source — Verified against operator sources · data pending on-site verification