31 facilities · 10 operators · 192 MW tracked
Colocation in Ireland: pricing, providers and markets
10 operators run 31 tracked data centers in Ireland across 1 cities with at least three sites (24 operational, 192+ MW published, 1 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Ireland?
10 operators run 31 tracked data centers in Ireland; the largest by sites is Digital Realty (Interxion) (9). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Ireland publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Ireland
Operators with tracked data centers in Ireland, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Digital Realty (Interxion) | 9 / 9 | not published | DUB1 | SOC 2, SOC 3, PCI-DSS | — |
| Equinix | 6 / 6 | not published | Equinix DB1 | ISO 9001, ISO 22301, ISO 27001 | — |
| Pure Data Centres Group | 3 / 1 | 54 | Pure Data Centres — Dublin Ballycoolin, Building 1 (DUB01) | Zero Waste to Landfill Certification | — |
| EdgeConneX | 3 / 2 | 32 | EdgeConneX DUB01 | not published | — |
| Echelon Data Centres | 3 / 0 | not published | Echelon DUB10 (Clondalkin) | not published | 1 |
| Keppel DC REIT | 2 / 2 | not published | Keppel DC Dublin 2 | LEED v4.1 O+M Gold, ISO 9001, ISO 27001 | — |
| Viatel Technology Group | 2 / 2 | not published | Viatel VDC3 Profile Park | ISO 27001, ISO 9001, ISO 14001 | — |
| CyrusOne | 1 / 1 | 54 | CyrusOne DUB1 | not published | — |
| Vantage Data Centers | 1 / 0 | 52 | Vantage Dublin Campus (DUB1) | not published | — |
| Servecentric | 1 / 1 | not published | Servecentric Data Centre | Tier III | — |
Colocation markets in Ireland
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Dublin | 29 | 192 |
Availability in Ireland: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Ireland?
By tracked sites: Digital Realty (Interxion) with 9. By published IT capacity: Pure Data Centres Group with 54 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Ireland, including some that do not sell space.
Is there colocation capacity available in Ireland right now?
Coloprice tracks 31 facilities here (24 operational, 7 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Ireland?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Ireland
One brief, several operators with capacity in Ireland, same terms. Independent — no operator pays for position.