Colocation in Ireland: pricing, providers and markets

10 operators run 31 tracked data centers in Ireland across 1 cities with at least three sites (24 operational, 192+ MW published, 1 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Ireland?

10 operators run 31 tracked data centers in Ireland; the largest by sites is Digital Realty (Interxion) (9). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Ireland publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Ireland

Operators with tracked data centers in Ireland, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Digital Realty (Interxion)9 / 9not publishedDUB1SOC 2, SOC 3, PCI-DSS—
Equinix6 / 6not publishedEquinix DB1ISO 9001, ISO 22301, ISO 27001—
Pure Data Centres Group3 / 154Pure Data Centres — Dublin Ballycoolin, Building 1 (DUB01)Zero Waste to Landfill Certification—
EdgeConneX3 / 232EdgeConneX DUB01not published—
Echelon Data Centres3 / 0not publishedEchelon DUB10 (Clondalkin)not published1
Keppel DC REIT2 / 2not publishedKeppel DC Dublin 2LEED v4.1 O+M Gold, ISO 9001, ISO 27001—
Viatel Technology Group2 / 2not publishedViatel VDC3 Profile ParkISO 27001, ISO 9001, ISO 14001—
CyrusOne1 / 154CyrusOne DUB1not published—
Vantage Data Centers1 / 052Vantage Dublin Campus (DUB1)not published—
Servecentric1 / 1not publishedServecentric Data CentreTier III—

Colocation markets in Ireland

CitySites / livePublished MW
Colocation in Dublin29192

Availability in Ireland: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Ireland?

By tracked sites: Digital Realty (Interxion) with 9. By published IT capacity: Pure Data Centres Group with 54 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Ireland, including some that do not sell space.

Is there colocation capacity available in Ireland right now?

Coloprice tracks 31 facilities here (24 operational, 7 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Ireland?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.