NTT Osaka OSK12 Data Center is a data center in Osaka (Ibaraki), Japan, operated by NTT Global Data Centers, with 36 MW of published IT capacity, currently under construction.

36 MW two-building campus under construction in Ibaraki City, Osaka Prefecture (groundbreaking October 2025), engineered for high-density liquid-cooled AI and HPC infrastructure with an 18 MW first phase delivering in 2028.

NTT Osaka OSK12 Data Center — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction

5 of 14 fields published · Operator? Add or correct data →

Units
City
Osaka (Ibaraki), Japan
Power, MW
36 MW
Cooling
Liquid
AI-ready
Yes
Market benchmark
$280 per kW per month wholesale · Japan
Index rate for the market, not this operator’s price list

3 sources · data pending on-site verification

—

Coloprice Score

22 out of 100

limited data · #59 of 145 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
NTT Osaka OSK12 Data Center — Coloprice Score 22
<a href="https://coloprice.com/data-centers/japan/osaka/ntt-osaka-osk12/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ntt-osaka-osk12.svg"
    alt="NTT Osaka OSK12 Data Center — Coloprice Score 22" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

NTT Osaka OSK12 Data Center — Top 10 data centers in Osaka (Ibaraki), Japan 2026
#10 of 32 · See the list →

NTT Global Data Centers is extending its Kansai footprint with OSK12, a two-building campus under construction in Ibaraki City, roughly 20 km north of central Osaka. NTT held a groundbreaking ceremony on the site on October 1, 2025, and the campus is designed for 36 MW of total IT load, with an 18 MW first building targeted for completion in early 2028 offering about 5,000 square meters of server room space in a three-storey, seismically isolated structure. The design anticipates the shift toward accelerated computing: white space is engineered for high-density racks with support for direct liquid cooling alongside conventional air systems, positioning the campus for AI training and inference clusters as well as cloud platforms. Ibaraki sits in a comparatively low disaster-risk zone, and NTT positions the campus both as primary Kansai capacity and as a recovery location for workloads concentrated in Greater Tokyo. Engineering follows Tier III-equivalent redundancy principles with concurrently maintainable power and cooling systems. For hyperscalers and enterprises seeking AI-ready capacity in Japan's second-largest data center market, OSK12 stands among the Kansai region's most significant pipeline projects.

  • ▮Groundbreaking held October 1, 2025 in Ibaraki City
  • ▮36 MW two-building campus, 18 MW first phase in 2028
  • ▮Direct liquid cooling support for AI and HPC racks
  • ▮Three-storey seismically isolated build in low disaster-risk zone
  • ▮About 20 km north of central Osaka in Ibaraki City

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Osaka (Ibaraki)

FacilityOperatorPower, MWTierStatus
NTT Osaka OSK12 Data CenterNTT Global Data Centers36—Under construction
Equinix OS3Equinix——Operational
Equinix OS1Equinix——Operational
Equinix OS2xEquinix——Operational
Vantage Osaka Campus (KIX1)Vantage Data Centers68—Under construction