▮▮Coloprice
← Japan

32 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Osaka: 32 facilities, colocation pricing

Colocation pricing and providers in Osaka →

How many data centers are in Osaka?

Coloprice tracks 32 data centers in Osaka, Japan: 27 operational, 5 under construction and 0 announced, run by 16 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.185

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 3 AI-ready · 289+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Osaka (Ibaraki), Japan· · ·$0.18532—
South Korea· · ·$0.11864—
Singapore$403$0.27062—
United States$196$0.1171344—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Osaka?

Coloprice tracks 32 data centers in Osaka, Japan: 27 operational, 5 under construction and 0 announced, run by 16 operators.

Which operators run data centers in Osaka?

By number of facilities tracked: MC Digital Realty (5), Optage (4), Equinix (3), AT TOKYO (3), Internet Initiative Japan (IIJ) (3).

What is the total data center power capacity in Osaka?

Facilities that publish capacity add up to 289 MW (11 of 32 sites disclose a figure); the largest published site is Vantage Osaka Campus (KIX1) with 68 MW.

How much does colocation cost in Osaka (Ibaraki), Japan?

No published wholesale $/kW benchmark exists for Osaka (Ibaraki), Japan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 32 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Osaka (Ibaraki), Japan?

Commercial electricity in Osaka (Ibaraki), Japan is $0.185 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 32 facilities in our catalog, 5 of them announced or under construction.

Where is colocation cheaper near Osaka (Ibaraki), Japan?

On power alone, South Korea ($0.118/kWh), United States ($0.117/kWh) run below Osaka (Ibaraki), Japan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Osaka (Ibaraki), Japan market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Osaka (Ibaraki) vs Tokyo (Inzai)Osaka (Ibaraki) vs Yokohama, KanagawaKasuya, Fukuoka vs Osaka (Ibaraki)

Data centers

FacilityOperatorPower, MWTierStatus
NTT Osaka OSK12 Data CenterNTT Global Data Centers36—Under construction
Equinix OS3Equinix——Operational
Equinix OS1Equinix——Operational
Equinix OS2xEquinix——Operational
Vantage Osaka Campus (KIX1)Vantage Data Centers68—Under construction
Telehouse OsakaTelehouse6.6—Operational
AT TOKYO KC1 (Kansai Central Center)AT TOKYO——Operational
AT TOKYO KDC3 (Kansai Dai-3 Center)AT TOKYO——Operational
MC Digital Realty KIX10MC Digital Realty7.6—Operational
MC Digital Realty KIX11MC Digital Realty25—Operational
MC Digital Realty KIX12MC Digital Realty20—Operational
MC Digital Realty KIX13MC Digital Realty21—Operational
IDC Frontier Osaka Suita Data CenterIDC Frontier——Operational
Sakura Internet Dojima Data CenterSakura Internet——Operational
CyrusOne KEP OSK1 Data CenterCyrusOne48—Under construction
Ada Infrastructure Osaka East (OSE1)Ada Infrastructure18—Under construction
Nexcenter Osaka 5 Data CenterNTT Communications (NTT DOCOMO BUSINESS) — Nexcenter——Operational
Nexcenter Osaka 7 Data CenterNTT Communications (NTT DOCOMO BUSINESS) — Nexcenter——Operational
IIJ Shinsaibashi Data CenterInternet Initiative Japan (IIJ)——Operational
IIJ Dojima Data CenterInternet Initiative Japan (IIJ)——Operational
IIJ Takatsu Data CenterInternet Initiative Japan (IIJ)——Operational
Digital Edge OSA1Digital Edge14.4—Operational
Digital Edge OSA2Digital Edge——Operational
AT TOKYO DC12AT TOKYO——Operational
Optage Sonezaki Data Center (OC1)Optage——Operational
Optage Shinsaibashi Data CenterOptage——Operational
Optage Umeda-Kita Data CenterOptage——Operational
MC Digital Realty KIX15MC Digital Realty24—Under construction
NTT DATA Dojima Data CenterNTT DATA——Operational
NTT SmartConnect Nipponbashi Data Center (Dojima Campus)NTT SmartConnect——Operational
NTT SmartConnect Kitahama Data Center (Dojima Campus)NTT SmartConnect——Operational
Optage Osaka Kitahorie Data CenterOptage——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.