16 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Osaka (Ibaraki): 16 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.185
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 250+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Osaka (Ibaraki), Japan | · · · | $0.185 | 16 | — |
| South Korea | · · · | $0.118 | 38 | — |
| Singapore | $403 | $0.270 | 49 | — |
| United States | $196 | $0.109 | 837 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Osaka (Ibaraki), Japan?
No published wholesale $/kW benchmark exists for Osaka (Ibaraki), Japan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 16 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Osaka (Ibaraki), Japan?
Commercial electricity in Osaka (Ibaraki), Japan is $0.185 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 16 facilities in our catalog, 4 of them announced or under construction.
Where is colocation cheaper near Osaka (Ibaraki), Japan?
On power alone, South Korea ($0.118/kWh), United States ($0.109/kWh) run below Osaka (Ibaraki), Japan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Osaka (Ibaraki), Japan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NTT Osaka OSK12 Data Center | NTT Global Data Centers | 36 | — | Announced |
| Equinix OS3 | Equinix | — | — | Operational |
| Equinix OS1 | Equinix | — | — | Operational |
| Equinix OS2x | Equinix | — | — | Operational |
| Vantage Osaka Campus (KIX1) | Vantage Data Centers | 68 | — | Under construction |
| Telehouse Osaka | Telehouse | 6.6 | — | Operational |
| AT TOKYO KC1 (Kansai Central Center) | AT TOKYO | — | — | Operational |
| AT TOKYO KDC3 (Kansai Dai-3 Center) | AT TOKYO | — | — | Operational |
| MC Digital Realty KIX10 | MC Digital Realty | 7.6 | — | Operational |
| MC Digital Realty KIX11 | MC Digital Realty | 25 | — | Operational |
| MC Digital Realty KIX12 | MC Digital Realty | 20 | — | Operational |
| MC Digital Realty KIX13 | MC Digital Realty | 21 | — | Operational |
| IDC Frontier Osaka Suita Data Center | IDC Frontier | — | — | Operational |
| Sakura Internet Dojima Data Center | Sakura Internet | — | — | Operational |
| CyrusOne KEP OSK1 Data Center | CyrusOne | 48 | — | Under construction |
| Ada Infrastructure Osaka East (OSE1) | Ada Infrastructure | 18 | — | Under construction |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.