Vantage Osaka Campus (KIX1) is a data center in Osaka (Ibaraki), Japan, operated by Vantage Data Centers, with 68 MW of published IT capacity, currently under construction.

Vantage's Osaka campus in Ibaraki, planned for two seismically base-isolated data centers totaling 68 MW of critical IT load, with the first 28 MW facility scheduled for mid-2026.

Vantage Osaka Campus (KIX1) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction

6 of 14 fields published · Operator? Add or correct data →

Units
Operator
Vantage Data Centers
City
Osaka (Ibaraki), Japan
Power, MW
68 MW
Cooling
Air
Floor space
45,000 m²
Market benchmark
$280 per kW per month wholesale · Japan
Index rate for the market, not this operator’s price list

1 sources · data pending on-site verification

—

Coloprice Score

21 out of 100

limited data · #63 of 133 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency7/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Vantage Osaka Campus (KIX1) — Coloprice Score 21
<a href="https://coloprice.com/data-centers/japan/osaka/vantage-osaka-japan/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/vantage-osaka-japan.svg"
    alt="Vantage Osaka Campus (KIX1) — Coloprice Score 21" height="64">
</a>

Vantage's Osaka campus (KIX1) occupies 12 acres (5 hectares) in Ibaraki, about 76 km from Kansai International Airport, and is planned to reach 68 MW of critical IT load across two data centers and 485,000 sq ft. The first, 28 MW facility is scheduled to become operational in mid-2026, with the second building completing the campus's build-out. The design uses seismic base-isolation structures, notable given Japan's earthquake risk, alongside a closed-loop chilled-water system with air-side economizers and N+2 component-level mechanical redundancy targeting near-zero water use. An on-site 77 kV substation provides N+1 power, and the campus is carrier-neutral with two meet-me-rooms per data center and three points of entry. Vantage has committed to net-zero carbon emissions by 2030 and provides EV charging for both cars and bikes. No third-party certification is published for the site. Osaka is one of Vantage's newer APAC markets, alongside its established Hong Kong, Malaysia and Australia campuses.

  • ▮Planned 68 MW critical IT load across two buildings, 485,000 sq ft; phase 1 (28 MW) live mid-2026
  • ▮Seismic base-isolation structures on a 12-acre Ibaraki campus near Kansai International Airport
  • ▮N+1 77kV substation; N+2 component-level mechanical redundancy
  • ▮Carrier-neutral, two MMRs per data center, three points of entry
  • ▮Net-zero carbon commitment by 2030; no third-party certification published

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Osaka (Ibaraki)

FacilityOperatorPower, MWTierStatus
Vantage Osaka Campus (KIX1)Vantage Data Centers68—Under construction
NTT Osaka OSK12 Data CenterNTT Global Data Centers36—Under construction
Equinix OS3Equinix——Operational
Equinix OS1Equinix——Operational
Equinix OS2xEquinix——Operational
Telehouse OsakaTelehouse6.6—Operational

Source — Verified against operator sources · data pending on-site verification