▮▮Coloprice

Digital Edge TYO1

Operational

3-1-12 Sekiguchi, Bunkyo-ku, Tokyo 112-0014, Japan

Digital Edge TYO1 is a data center in Tokyo, Japan, operated by Digital Edge, with 3.76 MW of published IT capacity, currently operational.

Digital Edge colocation facility in Tokyo's Bunkyo ward with 3.76 MW of IT power across 940 cabinets, linked to the operator's nearby TYO2 and TYO3 sites.

Digital Edge TYO1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Digital Edge
City
Tokyo, Japan
Power, MW
3.76 MW
Cooling
Air
Floor space
2,471 m²
Racks
940
ISO 14001ISO 27001ISO 45001
D

Coloprice Score

37 out of 100

Class D · #23 of 110 in Japan

  • Resilience0/35
  • Compliance10/20
  • Transparency12/20
  • Scale8/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Digital Edge TYO1 — Coloprice Score 37
<a href="https://coloprice.com/data-centers/japan/tokyo/digital-edge-tyo1-tokyo/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/digital-edge-tyo1-tokyo.svg"
    alt="Digital Edge TYO1 — Coloprice Score 37" height="64">
</a>

Connectivity: 6 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Digital Edge TYO1 — Top 25 data centers in Japan 2026
#23 of 110 · See the list →
Digital Edge TYO1 — Top 25 data centers in Tokyo (Inzai), Japan 2026
#19 of 67 · See the list →

TYO1 is one of Digital Edge's network of Tokyo-area colocation facilities, located in the Bunkyo ward within walking distance of a Yamanote Line station and close to the city's key telecommunications hubs. The five-story, purpose-built building holds 2,471 square meters of colocation space configured for 940 cabinets at 4 kVA each, backed by N+1 parallel-redundant UPS and three 4,000 kVA gas turbine generators in N+1 configuration, with a designed annual PUE of 1.5. Digital Edge links TYO1 to its nearby TYO2 (formerly ComSpace1) and TYO3 (formerly ComSpace2) facilities over its own Cross Link interconnect fabric, positioning the site for customers who need both standalone deployments and access to Digital Edge's broader Tokyo network. The facility holds ISO 14001, 27001 and 45001 management-system certifications and offers a 100% availability SLA on dual power circuits. Digital Edge markets TYO1 primarily toward cloud, network and enterprise customers running high power density deployments rather than large hyperscale footprints.

  • ▮3.76 MW IT capacity across 940 cabinets, 2,471 sqm
  • ▮Bunkyo ward location, linked to TYO2/TYO3 via Cross Link interconnect
  • ▮N+1 parallel UPS, three 4,000 kVA gas turbine generators
  • ▮ISO 14001, 27001, 45001 certified; designed annual PUE 1.5

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Tokyo

Source — Verified against operator sources · data pending on-site verification