1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Ramtha: 1 facilities, colocation pricing
How many data centers are in Ramtha?
Coloprice tracks 1 data centers in Ramtha, Jordan: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.169
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Ramtha, Jordan | · · · | $0.169 | 1 | — |
| Saudi Arabia | · · · | $0.074 | 32 | — |
| Israel | · · · | $0.117 | 25 | — |
| Iraq | · · · | $0.046 | 15 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Ramtha?
Coloprice tracks 1 data centers in Ramtha, Jordan: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Ramtha?
By number of facilities tracked: JORSIT (Jordanian Specialists for Information Security) (1).
How much does colocation cost in Ramtha, Jordan?
No published wholesale $/kW benchmark exists for Ramtha, Jordan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Ramtha, Jordan?
Commercial electricity in Ramtha, Jordan is $0.169 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Ramtha, Jordan?
On power alone, Saudi Arabia ($0.074/kWh), Israel ($0.117/kWh), Iraq ($0.046/kWh) run below Ramtha, Jordan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Ramtha, Jordan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| JORSIT RAID DC1 | JORSIT (Jordanian Specialists for Information Security) | — | IV | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Ramtha: free, reply within one business day
Get Quotes →