4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Kyrgyzstan: Q3 2026 Price Index
Compare 4 data centers in Kyrgyzstan across 3 operators, 1 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Kyrgyzstan & other markets — The Colocation Price Index → · Best data centers in Kyrgyzstan → · Data center companies in Kyrgyzstan · Colocation pricing and providers in Kyrgyzstan →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Datatime Bishkek Data Center | Datatime LLC | Kyrgyzstan | Bishkek | 0.5 | III | — | 40D | Operational |
| Data Centre of the National Bank of the Kyrgyz Republic | National Bank of the Kyrgyz Republic (NBKR) | Kyrgyzstan | Bishkek | — | III | — | data pending | Operational |
| NBKR Reserve Data Center | National Bank of the Kyrgyz Republic (NBKR) | Kyrgyzstan | Bishkek | — | III | — | data pending | Under construction |
| Kyrgyztelecom Data Center / Co-location | OJSC Kyrgyztelecom | Kyrgyzstan | Bishkek | — | — | — | data pending | Operational |
Nothing matches the filters
All 4 facilities, A–Z
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.050
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 0 AI-ready · 1+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Kyrgyzstan | · · · | $0.050 | 4 | — |
| Kazakhstan | · · · | $0.090 | 23 | — |
| Uzbekistan | · · · | $0.093 | 10 | — |
| Armenia | · · · | $0.122 | 7 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Kyrgyzstan has the cheapest power in this index at $0.050/kWh — under a third of Ukraine's $0.181 — and almost no capacity to spend it on. One facility is recorded: Datatime in Bishkek, 500 kW across roughly 100 racks, with two 6 kV feeds, two 1 MW generators holding twelve hours of fuel, and a Tier III Design certificate. The tariff needs care before it goes into a model. The headline 4.33 KGS/kWh is the commercial rate; energy-intensive consumers pay 6.84, the regulator assigns the category, and landing in the higher one raises the power line by roughly 1.6x. Generation is almost entirely hydro with sharp seasonality, the country imports in low-inflow winters, and an energy state of emergency has been in force since August 2023. Cheap power here is a winter-import question, not a settled input.
Frequently asked questions
How much does colocation cost in Kyrgyzstan?
No published wholesale $/kW benchmark exists for Kyrgyzstan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Kyrgyzstan?
Commercial electricity in Kyrgyzstan is $0.050 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Kyrgyzstan?
Kyrgyzstan sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Kyrgyzstan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Kyrgyzstan?
Coloprice tracks 4 data centers in Kyrgyzstan: 3 operational with 1 MW of published IT power, 1 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
