Nabiax ADC3 (Alcalá Data Center 3)

Under construction

Nabiax ADC3 (Alcalá Data Center 3) is a data center in Alcalá de Henares (Madrid), Spain, operated by Nabiax, with 100 MW of published IT capacity, currently under construction.

Third building of Nabiax's Alcalá de Henares campus near Madrid: up to 100 MW of IT capacity added in phases through 2029, an investment of nearly €800 million; ceremonial first stone laid in September 2026.

Nabiax ADC3 (Alcalá Data Center 3) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction

7 of 14 fields published · Operator? Add or correct data →

Units
Operator
Nabiax
City
Alcalá de Henares (Madrid), Spain
Power, MW
100 MW
Cooling
Air
Renewable energy
100%
AI-ready
Yes
Address
Alcalá de Henares, Madrid, Spain · Open in maps ↗

2 sources · data pending on-site verification

E

Coloprice Score

25 out of 100

Class E · #55 of 93 in Spain

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Nabiax ADC3 (Alcalá Data Center 3) — Coloprice Score 25
<a href="https://coloprice.com/data-centers/spain/alcala-de-henares/nabiax-adc3-alcala/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/nabiax-adc3-alcala.svg"
    alt="Nabiax ADC3 (Alcalá Data Center 3) — Coloprice Score 25" height="64">
</a>

ADC3 is the next stage of Nabiax's Alcalá de Henares campus east of Madrid, next to the existing ADC1 and ADC2 buildings. According to the operator, it will add up to 100 MW of IT capacity in phases through 2029, aimed at hyperscale, cloud and AI workloads, and lift Nabiax to 135 MW of installed IT power in Spain across its Madrid and Catalonia sites. Nabiax puts the investment at nearly €800 million. Ferrovial has been awarded the construction contract. The building is planned to run on 100% renewable electricity, use closed-circuit cooling and target BREEAM Excellent certification. The company expects around 1,000 jobs during construction and more than 200 permanent positions once operating. The cornerstone ceremony took place in September 2026. Because delivery is phased, capacity will come online in stages rather than as a single handover, and published dates for individual phases have not been given. Nabiax has not stated a PUE target or a rack-density figure for ADC3.

  • ▮Up to 100 MW of IT capacity, delivered in phases through 2029
  • ▮Investment of nearly €800 million; construction by Ferrovial
  • ▮Takes Nabiax to 135 MW of installed IT power in Spain
  • ▮100% renewable power, closed-circuit cooling, BREEAM Excellent target

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Alcalá de Henares (Madrid)

FacilityOperatorPower, MWTierStatus
Nabiax ADC3 (Alcalá Data Center 3)Nabiax100—Under construction
Nabiax Alcalá Data Center CampusNabiax22.3IVOperational
Adam Madrid Data CenterAdam2—Operational
Templus MAD01Templus20III*Operational
ACS/Iridium Alcalá de Henares Data CenterACS Group (Iridium)50—Announced

Source — Verified against operator sources · data pending on-site verification