▮▮Coloprice

Digital Edge–B.Grimm Chonburi Campus

Under construction

Chonburi Province, Eastern Economic Corridor, Thailand

Digital Edge–B.Grimm Chonburi Campus is a data center in Chonburi (Eastern Economic Corridor), Thailand, operated by Digital Edge / B.Grimm Power, with 100 MW of published IT capacity, currently under construction.

100 MW AI-ready campus under construction in Thailand's Eastern Economic Corridor, a Digital Edge–B.Grimm Power joint venture drawing on B.Grimm's renewable generation, targeted for Q4 2026 Ready-for-Service.

Digital Edge–B.Grimm Chonburi Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Digital Edge / B.Grimm Power
City
Chonburi (Eastern Economic Corridor), Thailand
Power, MW
100 MW
Cooling
Air
AI-ready
Yes

Coloprice Score

22 out of 100

limited data · #10 of 29 in Thailand

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Digital Edge–B.Grimm Chonburi Campus — Coloprice Score 22
<a href="https://coloprice.com/data-centers/thailand/chonburi/digital-edge-bgrimm-chonburi/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/digital-edge-bgrimm-chonburi.svg"
    alt="Digital Edge–B.Grimm Chonburi Campus — Coloprice Score 22" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Digital Edge–B.Grimm Chonburi Campus — Top 10 data centers in Thailand 2026
#10 of 29 · See the list →

Digital Edge and Thai energy group B.Grimm Power are jointly developing a 100 MW data center campus in Chonburi province, inside Thailand's Eastern Economic Corridor (EEC) — the government's flagship industrial and digital-investment zone east of Bangkok. The campus is part of a wider $1 billion Digital Edge investment plan to build hyperscale and AI-ready capacity across Thailand, joining the company's existing Bangkok sites. B.Grimm Power, a longstanding Thai independent power producer with a large renewable generation portfolio, supplies power for the site, positioning it as a lower-carbon alternative to grid-only campuses. Digital Edge is marketing the facility explicitly toward AI and cloud workloads, citing high-density colocation capability and its standard interconnection stack for hyperscalers and enterprises expanding across Southeast Asia. No anchor tenant has been publicly named. Construction is underway, with a targeted Ready-for-Service date of Q4 2026, which would make it one of the first EEC-based hyperscale campuses to reach commercial operation.

  • 100 MW campus in Thailand's Eastern Economic Corridor
  • Joint venture with Thai IPP B.Grimm Power
  • Part of Digital Edge's $1B Thailand investment plan
  • AI/hyperscaler-focused, high-density colocation design
  • Targeted Ready-for-Service Q4 2026

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Chonburi (Eastern Economic Corridor)