NTT Bangkok 4
Under constructionAmata City Chonburi Industrial Estate, Chonburi, Thailand
NTT Bangkok 4 is a data center in Chonburi, Thailand, operated by NTT Global Data Centers, with 100 MW of published IT capacity, currently under construction.
NTT's fourth Chonburi campus building, contracted for 100 MW under a new PPA with Amata B.Grimm Power, breaking ground in 2026 alongside operational Bangkok 2 and Bangkok 3 with energization planned for Q2 2027.

- Operator
- NTT Global Data Centers
- City
- Chonburi, Thailand
- Power, MW
- 100 MW
- Cooling
- Air
- AI-ready
- Yes
Coloprice Score
22 out of 100
limited data · #18 of 42 in Thailand
- Resilience0/35
- Compliance0/20
- Transparency6/20
- Scale13/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
NTT Global Data Centers broke ground on Bangkok 4 in 2026, expanding its Chonburi campus alongside the operational Bangkok 2 and Bangkok 3 buildings at the Amata City Chonburi industrial estate in Thailand's Eastern Economic Corridor. The facility is contracted for 100 MW of power under a new purchase agreement with Amata B.Grimm Power, a subsidiary of Thai utility B.Grimm Power that already supplies NTT's two existing Chonburi buildings, with energization planned for the second quarter of 2027. Fuji Electric is building the campus's 115kV gas-insulated switchgear substation using locally manufactured transformers and switchboards — the company's first data center substation project in Thailand and its first local partnership with NTT. At 100 MW, Bangkok 4 dwarfs Bangkok 2 (3.6 MW) and Bangkok 3 (12 MW), reflecting the jump in scale hyperscale and AI tenants are now demanding from the Eastern Economic Corridor. NTT has not disclosed floor space, PUE targets or a customer list for the building. The project extends NTT's Chonburi cluster toward a planned fourth site once the previously announced Bangkok 5 land purchase with AMATA Corporation is developed, making the campus NTT's largest committed capacity in Thailand.
- ▮100 MW contracted under a new PPA with Amata B.Grimm Power
- ▮Energization planned for Q2 2027
- ▮Fourth NTT building at Amata City Chonburi, joining Bangkok 2 and Bangkok 3
- ▮Fuji Electric building 115kV GIS substation — its first DC substation project in Thailand
- ▮Far larger than Bangkok 2 (3.6 MW) and Bangkok 3 (12 MW)
Colocation pricing: Thailand & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Chonburi
Source — Verified against operator sources · data pending on-site verification