1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in T. Don Hua Lo, A. Muang: 1 facilities, colocation pricing
How many data centers are in T. Don Hua Lo, A. Muang?
Coloprice tracks 1 data centers in T. Don Hua Lo, A. Muang, Thailand: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.128
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| T. Don Hua Lo, A. Muang, Thailand | · · · | $0.128 | 1 | — |
| Singapore | $403 | $0.270 | 60 | — |
| Malaysia | · · · | $0.135 | 84 | — |
| Vietnam | · · · | $0.080 | 46 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in T. Don Hua Lo, A. Muang?
Coloprice tracks 1 data centers in T. Don Hua Lo, A. Muang, Thailand: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in T. Don Hua Lo, A. Muang?
By number of facilities tracked: NTT Global Data Centers (1).
How much does colocation cost in T. Don Hua Lo, A. Muang, Thailand?
No published wholesale $/kW benchmark exists for T. Don Hua Lo, A. Muang, Thailand yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in T. Don Hua Lo, A. Muang, Thailand?
Commercial electricity in T. Don Hua Lo, A. Muang, Thailand is $0.128 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near T. Don Hua Lo, A. Muang, Thailand?
On power alone, Vietnam ($0.080/kWh) run below T. Don Hua Lo, A. Muang, Thailand. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full T. Don Hua Lo, A. Muang, Thailand market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NTT-BKK2-DC. Level 2E, 2W, 3E | NTT Global Data Centers | — | 3 | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in T. Don Hua Lo, A. Muang: free, reply within one business day
Get Quotes →