3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Masdar City: 3 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.110
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 75+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Masdar City, United Arab Emirates | · · · | $0.110 | 3 | — |
| India | · · · | $0.122 | 125 | — |
| Germany | · · · | $0.283 | 90 | — |
| Singapore | $403 | $0.270 | 33 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Masdar City, United Arab Emirates?
No published wholesale $/kW benchmark exists for Masdar City, United Arab Emirates yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Masdar City, United Arab Emirates?
Commercial electricity in Masdar City, United Arab Emirates is $0.110 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Masdar City, United Arab Emirates?
Masdar City, United Arab Emirates sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Masdar City, United Arab Emirates market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Khazna AUH6 | Khazna Data Centers | 31.8 | — | Operational |
| Khazna AUH8 | Khazna Data Centers | 30 | — | Under construction |
| Khazna AUH1 | Khazna Data Centers | 13.2 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.