▮▮Coloprice
← United Arab Emirates

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Masdar City: 1 facilities, colocation pricing

How many data centers are in Masdar City?

Coloprice tracks 1 data centers in Masdar City, United Arab Emirates: 1 operational, 0 under construction and 0 announced, run by 1 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.110

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 13+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Masdar City, United Arab Emirates· · ·$0.1101—
India· · ·$0.109306—
Germany$250$0.269274—
Singapore$403$0.27060—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Masdar City?

Coloprice tracks 1 data centers in Masdar City, United Arab Emirates: 1 operational, 0 under construction and 0 announced, run by 1 operators.

Which operators run data centers in Masdar City?

By number of facilities tracked: Khazna Data Centers (1).

What is the total data center power capacity in Masdar City?

Facilities that publish capacity add up to 13 MW (1 of 1 sites disclose a figure); the largest published site is Khazna AUH1 with 13.2 MW.

How much does colocation cost in Masdar City, United Arab Emirates?

No published wholesale $/kW benchmark exists for Masdar City, United Arab Emirates yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Masdar City, United Arab Emirates?

Commercial electricity in Masdar City, United Arab Emirates is $0.110 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Masdar City, United Arab Emirates?

On power alone, India ($0.109/kWh) run below Masdar City, United Arab Emirates. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Masdar City, United Arab Emirates market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
Khazna AUH1Khazna Data Centers13.2—Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.