5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Montevideo: 5 facilities, colocation pricing
Colocation pricing and providers in Montevideo →
How many data centers are in Montevideo?
Coloprice tracks 5 data centers in Montevideo, Uruguay: 5 operational, 0 under construction and 0 announced, run by 4 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.128
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 5 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Montevideo, Uruguay | · · · | $0.128 | 5 | — |
| Brazil | $160 | $0.152 | 245 | — |
| Argentina | · · · | $0.092 | 42 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Montevideo?
Coloprice tracks 5 data centers in Montevideo, Uruguay: 5 operational, 0 under construction and 0 announced, run by 4 operators.
Which operators run data centers in Montevideo?
By number of facilities tracked: Banco de la República Oriental del Uruguay (BROU) (2), Willinn by Zonamerica (MTI S.A.) (1), GEOCOM Uruguay S.A. (1), MTI (1).
How much does colocation cost in Montevideo, Uruguay?
No published wholesale $/kW benchmark exists for Montevideo, Uruguay yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Montevideo, Uruguay?
Commercial electricity in Montevideo, Uruguay is $0.128 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Montevideo, Uruguay?
On power alone, Argentina ($0.092/kWh) run below Montevideo, Uruguay. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Montevideo, Uruguay market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Zonamerica Datacenter I (Willinn) | Willinn by Zonamerica (MTI S.A.) | — | III | Operational |
| GeoCenter | GEOCOM Uruguay S.A. | — | III | Operational |
| BROU CPD 19 de Junio | Banco de la República Oriental del Uruguay (BROU) | — | III | Operational |
| Banco República CPD Casa Central | Banco de la República Oriental del Uruguay (BROU) | — | IV | Operational |
| MTI Zonamerica Datacenter I | MTI | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Uruguay
Colocation quotes in Montevideo: free, reply within one business day
Get Quotes →