RadiusDC Nashville I (Trinity Hills)

Under construction

RadiusDC Nashville I (Trinity Hills) is a data center in Nashville, United States, operated by RadiusDC, with 20 MW of published IT capacity, currently under construction.

RadiusDC's newly built Nashville facility in the Trinity Hills development, offering 20 MW across two concurrently maintainable data halls with closed-loop, no-water cooling.

RadiusDC Nashville I (Trinity Hills) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
RadiusDC
City
Nashville, United States
Power, MW
20 MW
Cooling
Liquid
Floor space
9,476 m²

Coloprice Score

23 out of 100

limited data · #473 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency7/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
RadiusDC Nashville I (Trinity Hills) — Coloprice Score 23
<a href="https://coloprice.com/data-centers/usa/nashville/radiusdc-nashville/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/radiusdc-nashville.svg"
    alt="RadiusDC Nashville I (Trinity Hills) — Coloprice Score 23" height="64">
</a>

RadiusDC's Nashville I facility sits in the Trinity Hills development in East Nashville, a newly built data center offering 20 MW of building utility capacity split across two concurrently maintainable, N+1 data halls of 6 MW each. The roughly 102,000-square-foot building uses a closed-loop, no-water cooling system and is designed for densities up to 400 watts per square foot, with 24 hours of onsite diesel fuel storage for backup power. RadiusDC, the rebranded successor to phoenixNAP's data center real estate, began marketing the Nashville site for lease in the second half of 2025, targeting a 2026 opening; as of this listing the facility should be treated as newly built and ramping rather than long-established, since no first-tenant go-live has been publicly confirmed. No third-party certifications have been published for the site.

  • 20 MW total, two concurrently maintainable 6 MW data halls (N+1)
  • ~102,000 sq ft, closed-loop no-water cooling, up to 400 W/sq ft
  • 24-hour onsite diesel fuel storage
  • Leasing began 2H 2025, targeting 2026 opening

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Nashville

Source — Verified against operator sources · data pending on-site verification