6 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Nashville: 6 facilities, colocation pricing
Colocation pricing and providers in Nashville →
How many data centers are in Nashville?
Coloprice tracks 6 data centers in Nashville, United States: 5 operational, 1 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 23+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Nashville, United States | · · · | $0.117 | 6 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 199 | — |
| Japan | $280 | $0.185 | 145 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Nashville?
Coloprice tracks 6 data centers in Nashville, United States: 5 operational, 1 under construction and 0 announced, run by 6 operators.
Which operators run data centers in Nashville?
By number of facilities tracked: EdgeConneX (1), RadiusDC (1), H5 Data Centers (1), Scipio Technologies (1), Compass Datacenters (1).
What is the total data center power capacity in Nashville?
Facilities that publish capacity add up to 23 MW (2 of 6 sites disclose a figure); the largest published site is RadiusDC Nashville I (Trinity Hills) with 20 MW.
How much does colocation cost in Nashville, United States?
No published wholesale $/kW benchmark exists for Nashville, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Nashville, United States?
Commercial electricity in Nashville, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Nashville, United States?
Nashville, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Nashville, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| EdgeConneX Nashville Edge Data Center (NAS01) | EdgeConneX | 3 | — | Operational |
| RadiusDC Nashville I (Trinity Hills) | RadiusDC | 20 | — | Under construction |
| H5 Data Centers Nashville | H5 Data Centers | — | — | Operational |
| Scipio Technologies Nashville Data Center | Scipio Technologies | — | — | Operational |
| Compass Datacenters Tierpoint Nashville 1 | Compass Datacenters | — | III | Operational |
| Level(3) Nashville (Sidco Drive) | Lumen Technologies | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
United States
Colocation quotes in Nashville: free, reply within one business day
Get Quotes →