Aligned ORD-02 (Northlake)
Operational501 Northwest Ave, Northlake, IL 60164
Aligned ORD-02 (Northlake) is a data center in Northlake, United States, operated by Aligned Data Centers, with 36 MW of published IT capacity, currently operational.
36 MW, 228,768 sq ft building on Aligned’s 18.5-acre Northlake campus near O’Hare, the first data center to earn OCP Ready for Hyperscale certification.

- Operator
- Aligned Data Centers
- City
- Northlake, United States
- Power, MW
- 36 MW
- Cooling
- Liquid
- Floor space
- 21,253 m²
- Renewable energy
- 100%
- AI-ready
- Yes
Coloprice Score
51 out of 100
Class C · #23 of 574 in United States
- Resilience6/35
- Compliance11/20
- Transparency12/20
- Scale15/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
ORD-02 is the confirmed-capacity building on Aligned Data Centers’ 18.5-acre Northlake campus outside Chicago, sharing the site with the earlier ORD-01. Aligned’s own spec sheet for the building states 228,768 gross sq ft and 36 MW of capacity, drawing on dual utility substations that give the campus 170 MW of total available capacity at a stated utility cost of $0.057/kWh. Cooling uses Aligned’s Delta Cube system, which the operator describes as absorbing heat at its source and configurable from N through 2N redundancy depending on tenant requirements. ORD-02 is notable within Aligned’s portfolio as the company’s first facility to achieve OCP Ready for Hyperscale certification, alongside the standard North American compliance package — SOC 2 Type 2, PCI DSS, HIPAA/HITECH, NIST 800-53 and ISO 27001:2022. At full build, the Northlake campus (ORD-01 and ORD-02 combined) spans roughly 520,000 sq ft and about 72 MW of critical load, with a third Aligned building, ORD-03, added later on a separate 36-acre site in nearby Elk Grove Village.
- ▮228,768 sq ft / 36 MW confirmed capacity
- ▮First Aligned facility certified OCP Ready for Hyperscale
- ▮Dual-substation campus, 170 MW total utility capacity
- ▮Delta Cube cooling, configurable N to 2N
- ▮Part of ~520,000 sq ft / ~72 MW two-building Northlake campus
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Northlake
Source — Verified against operator sources · data pending on-site verification