Novva Data Centers West Jordan
Operational6477 Wells Park Rd, West Jordan, UT 84081
Novva Data Centers West Jordan is a data center in West Jordan, UT, United States, operated by Novva Data Centers, with 120 MW of published IT capacity, currently operational, opened in 2023.
A 100-acre, four-building campus in West Jordan, Utah founded by a former C7 Data Centers executive, with Phase 1 operating since 2023 on a 200 MW N+1 substation and further phases under construction toward an ultimate build-out target of 175 MW.

- Operator
- Novva Data Centers
- City
- West Jordan, UT, United States
- Power, MW
- 120 MW
- Cooling
- Air
- Opened
- 2023
- Floor space
- 139,355 m²
- AI-ready
- Yes
Coloprice Score
34 out of 100
Class E · #211 of 804 in United States
- Resilience0/35
- Compliance0/20
- Transparency11/20
- Scale13/15
- Maturity10/10
Novva Data Centers operates a 100-acre campus in West Jordan, part of the Salt Lake City metro, founded by a former CEO of C7 Data Centers (the SLC-market operator later acquired by DataBank). Phase 1 opened in 2023 on a 200 MW N+1 substation, with the operator publishing 120 MW of current campus power capacity and further phases (2 through 4) under construction toward a stated ultimate build-out of 175 MW, targeted for completion in 2026. Cooling is described by Novva as waterless air-cooled chillers with no water evaporation used to cool, distinguishing the site from evaporative-cooling designs common elsewhere in the industry, alongside direct-to-chip liquid cooling capability in newer phases for high-density AI racks; the operator publishes an annualized PUE of 1.18. The full build-out spans four buildings totaling about 1.5 million sq ft. Compliance attestations include SOC 1, SOC 2, HIPAA, ISO 27001, ISO 22301 and PCI DSS, plus a LEED-certified design, but no Uptime Institute or TIA-942 Tier certification is published. The campus has drawn a reported $2 billion in financing from CIM Group and J.P. Morgan for continued expansion, and is positioned by the operator around AI and hyperscale workloads rather than traditional enterprise colocation.
- ▮100-acre, four-building campus; Phase 1 operational since 2023 on a 200 MW N+1 substation
- ▮120 MW of current campus power capacity, ultimate build-out targeted at 175 MW by 2026
- ▮Waterless air-cooled chiller design plus direct-to-chip liquid cooling for high-density AI racks in newer phases
- ▮Annualized PUE of 1.18 (operator's own figure)
- ▮Reported $2bn CIM Group/J.P. Morgan financing for continued expansion; no third-party Tier certification published
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in West Jordan, UT
Source — Verified against operator sources · data pending on-site verification