▮▮Coloprice

Novva Data Centers West Jordan

Operational

6477 Wells Park Rd, West Jordan, UT 84081

Novva Data Centers West Jordan is a data center in West Jordan, UT, United States, operated by Novva Data Centers, with 120 MW of published IT capacity, currently operational, opened in 2023.

A 100-acre, four-building campus in West Jordan, Utah founded by a former C7 Data Centers executive, with Phase 1 operating since 2023 on a 200 MW N+1 substation and further phases under construction toward an ultimate build-out target of 175 MW.

Novva Data Centers West Jordan — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Novva Data Centers
City
West Jordan, UT, United States
Power, MW
120 MW
Cooling
Air
Opened
2023
Floor space
139,355 m²
AI-ready
Yes
E

Coloprice Score

34 out of 100

Class E · #211 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency11/20
  • Scale13/15
  • Maturity10/10
How the score is calculated →
Embed score badge
Novva Data Centers West Jordan — Coloprice Score 34
<a href="https://coloprice.com/data-centers/usa/west-jordan/novva-data-centers-west-jordan/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/novva-data-centers-west-jordan.svg"
    alt="Novva Data Centers West Jordan — Coloprice Score 34" height="64">
</a>

Novva Data Centers operates a 100-acre campus in West Jordan, part of the Salt Lake City metro, founded by a former CEO of C7 Data Centers (the SLC-market operator later acquired by DataBank). Phase 1 opened in 2023 on a 200 MW N+1 substation, with the operator publishing 120 MW of current campus power capacity and further phases (2 through 4) under construction toward a stated ultimate build-out of 175 MW, targeted for completion in 2026. Cooling is described by Novva as waterless air-cooled chillers with no water evaporation used to cool, distinguishing the site from evaporative-cooling designs common elsewhere in the industry, alongside direct-to-chip liquid cooling capability in newer phases for high-density AI racks; the operator publishes an annualized PUE of 1.18. The full build-out spans four buildings totaling about 1.5 million sq ft. Compliance attestations include SOC 1, SOC 2, HIPAA, ISO 27001, ISO 22301 and PCI DSS, plus a LEED-certified design, but no Uptime Institute or TIA-942 Tier certification is published. The campus has drawn a reported $2 billion in financing from CIM Group and J.P. Morgan for continued expansion, and is positioned by the operator around AI and hyperscale workloads rather than traditional enterprise colocation.

  • 100-acre, four-building campus; Phase 1 operational since 2023 on a 200 MW N+1 substation
  • 120 MW of current campus power capacity, ultimate build-out targeted at 175 MW by 2026
  • Waterless air-cooled chiller design plus direct-to-chip liquid cooling for high-density AI racks in newer phases
  • Annualized PUE of 1.18 (operator's own figure)
  • Reported $2bn CIM Group/J.P. Morgan financing for continued expansion; no third-party Tier certification published

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in West Jordan, UT

Source — Verified against operator sources · data pending on-site verification