Market comparison
Geneva, Switzerland vs Glattbrugg, Switzerland
Both columns are built from the catalog and the price index: Geneva — 4 facilities from 3 operators, Glattbrugg — 5 facilities from 2 operators. Where a benchmark or a tariff is not published, the cell says so.
Geneva, Switzerland
4
Tracked facilities · Operators: 3
Wholesale benchmark, $/kW/month: not published
Glattbrugg, Switzerland
5
Tracked facilities · Operators: 2
Wholesale benchmark, $/kW/month: not published
Markets side by side
| Field | Geneva | Glattbrugg |
|---|---|---|
| Tracked facilities | 4 | 5 |
| Operators | 3 | 2 |
| Published IT capacity | 42 MW (2 of 4 sites publish) | 15 MW (1 of 5 sites publish) |
| Operational | 4 | 4 |
| Under construction / announced | 0 | 1 |
| Tier III+ certified sites | 0 | 0 |
| Sites with any certification | 1 | 4 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 0 |
| Wholesale benchmark, $/kW/month | not published | not published |
| Benchmark change, yoy | not published | not published |
| Industrial power tariff, $/kWh | $0.292 | $0.292 |
| Average Coloprice Score | 24/100 across 4 sites | 26/100 across 5 sites |
| Latency between the two | not published | |
Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Geneva — 4; Glattbrugg — 5
- Operators: Geneva — 3; Glattbrugg — 2
- Published IT capacity: Geneva — 42 MW (2 of 4 sites publish); Glattbrugg — 15 MW (1 of 5 sites publish)
- Under construction / announced: Geneva — 0; Glattbrugg — 1
- Sites with any certification: Geneva — 1; Glattbrugg — 4
- Average Coloprice Score: Geneva — 24/100 across 4 sites; Glattbrugg — 26/100 across 5 sites
Top facilities by score
Geneva, Switzerland
- Equinix GV1 Equinix
- STACK GEN02 STACK Infrastructure · 30 MW
- STACK GEN03 STACK Infrastructure · 12 MW
Open Geneva data centers →Open Glattbrugg data centers →Colocation pricing in Geneva →Colocation pricing in Glattbrugg →