Both columns are built from the catalog and the price index: Geneva — 6 facilities from 5 operators, Zurich (Winterthur) — 7 facilities from 7 operators. Where a benchmark or a tariff is not published, the cell says so.
Geneva, Switzerland
6
Tracked facilities · Operators: 5
Wholesale benchmark, $/kW/month: not published
Zurich (Winterthur), Switzerland
7
Tracked facilities · Operators: 7
Wholesale benchmark, $/kW/month: not published
Markets side by side
| Field | Geneva | Zurich (Winterthur) |
|---|---|---|
| Tracked facilities | 6 | 7 |
| Operators | 5 | 7 |
| Published IT capacity | 42 MW (2 of 6 sites publish) | 42 MW (2 of 7 sites publish) |
| Operational | 6 | 7 |
| Under construction / announced | 0 | 0 |
| Tier III+ certified sites | 0 | 0 |
| Sites with any certification | 1 | 1 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 0 |
| Wholesale benchmark, $/kW/month | not published | not published |
| Benchmark change, yoy | not published | not published |
| Industrial power tariff, $/kWh | $0.292 | $0.292 |
| Average Coloprice Score | 19/100 across 6 sites | 14/100 across 7 sites |
| Latency between the two | not published | |
Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Geneva — 6; Zurich (Winterthur) — 7
- Operators: Geneva — 5; Zurich (Winterthur) — 7
- Published IT capacity: Geneva — 42 MW (2 of 6 sites publish); Zurich (Winterthur) — 42 MW (2 of 7 sites publish)
- Operational: Geneva — 6; Zurich (Winterthur) — 7
- Average Coloprice Score: Geneva — 19/100 across 6 sites; Zurich (Winterthur) — 14/100 across 7 sites
Top facilities by score
Geneva, Switzerland
- Equinix GV1 Equinix
- STACK GEN02 STACK Infrastructure · 30 MW
- STACK GEN03 STACK Infrastructure · 12 MW
Zurich (Winterthur), Switzerland
- NorthC Winterthur (Zurich) NorthC · 1.8 MW
- Vantage Zurich I Campus (Winterthur) Vantage Data Centers · 40 MW
- DataCenter Winterthur DataCenter Winterthur
Open Geneva data centers →Open Zurich (Winterthur) data centers →Colocation pricing in Geneva →Colocation pricing in Zurich (Winterthur) →
Other comparisons
Geneva vs ZurichGeneva vs GlattbruggZurich (Winterthur) vs ZurichGlattbrugg vs Zurich (Winterthur)