5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Glattbrugg: 5 facilities, colocation pricing

Colocation pricing and providers in Glattbrugg →

How many data centers are in Glattbrugg?

Coloprice tracks 5 data centers in Glattbrugg, Switzerland: 4 operational, 1 under construction and 0 announced, run by 2 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.292

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 15+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Glattbrugg, Switzerland· · ·$0.2925—
France$190$0.173186—
Italy· · ·$0.323127—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Glattbrugg?

Coloprice tracks 5 data centers in Glattbrugg, Switzerland: 4 operational, 1 under construction and 0 announced, run by 2 operators.

Which operators run data centers in Glattbrugg?

By number of facilities tracked: Digital Realty (Interxion) (4), Green Datacenter (1).

What is the total data center power capacity in Glattbrugg?

Facilities that publish capacity add up to 15 MW (1 of 5 sites disclose a figure); the largest published site is ZUR4 with 15 MW.

How much does colocation cost in Glattbrugg, Switzerland?

No published wholesale $/kW benchmark exists for Glattbrugg, Switzerland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Glattbrugg, Switzerland?

Commercial electricity in Glattbrugg, Switzerland is $0.292 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Glattbrugg, Switzerland?

On power alone, France ($0.173/kWh), Germany ($0.269/kWh) run below Glattbrugg, Switzerland. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Glattbrugg, Switzerland market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Glattbrugg vs ZurichGlattbrugg vs Zurich (Winterthur)Geneva vs Glattbrugg

Data centers

FacilityOperatorPower, MWTierStatus
ZUR1Digital Realty (Interxion)——Operational
ZUR2Digital Realty (Interxion)——Operational
ZUR3Digital Realty (Interxion)——Operational
Green Datacenter ZRH4 (Glattbrugg)Green Datacenter——Operational
ZUR4Digital Realty (Interxion)15—Under construction