Data centers in Zurich: 7 facilities, colocation pricing

Colocation pricing and providers in Zurich →

How many data centers are in Zurich?

Coloprice tracks 7 data centers in Zurich, Switzerland: 7 operational, 0 under construction and 0 announced, run by 7 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.292

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 42+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Zurich (Winterthur), Switzerland· · ·$0.2927—
France$190$0.173186—
Italy· · ·$0.323127—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Zurich?

Coloprice tracks 7 data centers in Zurich, Switzerland: 7 operational, 0 under construction and 0 announced, run by 7 operators.

Which operators run data centers in Zurich?

By number of facilities tracked: Vantage Data Centers (1), NorthC (1), DataCenter Winterthur (1), AXA Versicherungen (1), Rechenzentrum Winterthur (1).

What is the total data center power capacity in Zurich?

Facilities that publish capacity add up to 42 MW (2 of 7 sites disclose a figure); the largest published site is Vantage Zurich I Campus (Winterthur) with 40 MW.

How much does colocation cost in Zurich (Winterthur), Switzerland?

No published wholesale $/kW benchmark exists for Zurich (Winterthur), Switzerland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Zurich (Winterthur), Switzerland?

Commercial electricity in Zurich (Winterthur), Switzerland is $0.292 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Zurich (Winterthur), Switzerland?

On power alone, France ($0.173/kWh), Germany ($0.269/kWh) run below Zurich (Winterthur), Switzerland. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Zurich (Winterthur), Switzerland market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Zurich (Winterthur) vs ZurichGeneva vs Zurich (Winterthur)Glattbrugg vs Zurich (Winterthur)

Data centers

FacilityOperatorPower, MWTierStatus
Vantage Zurich I Campus (Winterthur)Vantage Data Centers40—Operational
NorthC Winterthur (Zurich)NorthC1.8—Operational
DataCenter WinterthurDataCenter Winterthur——Operational
AXA Data CenterAXA Versicherungen——Operational
Rechenzentrum WinterthurRechenzentrum Winterthur——Operational
Green Data Center Zurich ZRH1Green Datacenter——Operational
eshelter ZurichColt——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.