▮▮Coloprice

Operator comparison

Iron Mountain vs Nabiax

Both columns come from the facilities each operator publishes and Coloprice tracks: Iron Mountain — 44 facilities in 7 countries, Nabiax — 4 facilities in 1 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.

Portfolios side by side

FieldIron MountainNabiax
Tracked facilities444
Countries71
Cities233
Published IT capacity1,000 MW (44 of 44 sites publish)134 MW (4 of 4 sites publish)
Operational283
Under construction / announced161
Liquid-cooled sites70
AI-ready sites31
Most common certificationsISO 14001, ISO 22301, ISO 27001, ISO 9001All 3 modules designed and built according to Uptime Institute Tier III standards, Designed and built to Tier III standards (ADC2), Operated according to Tier III standards, Uptime Institute Tier IV Certified Constructed Facility (ADC1)
Average Coloprice Score44/100 across 44 scored sites44/100 across 4 scored sites
Awards and badges838
Highest-scored facilityIron Mountain CHI-1 (69/100)Nabiax Alcalá Data Center Campus (69/100)

Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Tracked facilities: Iron Mountain — 44; Nabiax — 4
  • Countries: Iron Mountain — 7; Nabiax — 1
  • Cities: Iron Mountain — 23; Nabiax — 3
  • Published IT capacity: Iron Mountain — 1,000 MW (44 of 44 sites publish); Nabiax — 134 MW (4 of 4 sites publish)
  • Operational: Iron Mountain — 28; Nabiax — 3
  • Under construction / announced: Iron Mountain — 16; Nabiax — 1
  • Liquid-cooled sites: Iron Mountain — 7; Nabiax — 0
  • AI-ready sites: Iron Mountain — 3; Nabiax — 1
  • Most common certifications: Iron Mountain — ISO 14001, ISO 22301, ISO 27001, ISO 9001; Nabiax — All 3 modules designed and built according to Uptime Institute Tier III standards, Designed and built to Tier III standards (ADC2), Operated according to Tier III standards, Uptime Institute Tier IV Certified Constructed Facility (ADC1)
  • Average Coloprice Score: Iron Mountain — 44/100 across 44 scored sites; Nabiax — 44/100 across 4 scored sites
  • Awards and badges: Iron Mountain — 83; Nabiax — 8
  • Highest-scored facility: Iron Mountain — Iron Mountain CHI-1 (69/100); Nabiax — Nabiax Alcalá Data Center Campus (69/100)

Highest-scored facility

Open Iron Mountain profile →Open Nabiax profile →

Other comparisons

Digital Realty (Interxion) vs Iron MountainEquinix vs Iron MountainDigital Realty (Interxion) vs NabiaxEquinix vs Nabiax