Both columns come from what BYD Energy Storage and CRRC Zhuzhou Institute publish. Fields either maker does not publish are marked «not published»; we do not estimate or rank.
BYD Energy Storage
MC Cube-T Pro BESS
8.576 MWh
modular blockliquid-cooledLFPshipping
CRRC Zhuzhou Institute
6.X Liquid Cooling Energy Storage System
6.901 MWh
20 ft containerliquid-cooledLFPshipping
Specifications side by side
| Field | BYD Energy Storage MC Cube-T Pro BESS | CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage System |
|---|---|---|
| Max energy per enclosure | 8.576 MWh | 6.901 MWh |
| Max power per enclosure | 4.008 MW | not published |
| Published durations | 2 h · 4 h | 2 h · 4 h |
| Segment | utility-scale | utility-scale |
| Status | shipping | shipping |
| Cell chemistry | LFP | LFP |
| Cell capacity | not published | 587 Ah |
| Cell configuration | 2×6×1P416S (12-cube) / 2×8×1P416S (16-cube) | 416S4P (10-ft) / 416S8P (20-ft) |
| Cell supplier | not published | not published |
| Form factor | modular block | 20 ft container |
| Block type | DC block | DC block |
| PCS integrated | no | no |
| DC voltage | 1081.6–1489.3; 1331.2 nominal V | 1081.6–1497.6 V |
| Cooling | liquid-cooled | liquid-cooled |
| Ingress protection | IP55 | IP55 |
| Operating temperature | -30…55 °C | -30…55 °C |
| Dimensions (L × W × H) | 8815 × 2442 × 3170 mm | 6058 × 2438 × 2896 mm |
| Weight | not published | 48 t |
| Energy density | not published | not published |
| Round-trip efficiency | not published | not published |
| Cycle life | not published | not published |
| Calendar life | not published | not published |
| Warranty | not published | not published |
| Fire suppression | perfluorohexanone gas suppression + water spray | Aerosol-based suppression system; flooded fire protection systems (options); fire alarm panel, heat and smoke detection, alarm bell and strobe |
| Generation | MC Cube-T Pro (China market, A-series) | 6.X (2026) |
| Announced | 2024-04 | 2026-01 |
| Certifications | GB 44240, GB/T 34131, GB/T 36276, GB/T 44026 | IEC 61000, IEC 62477-1, IEC 62619, IEC 62933-5-2, IEC 63056, UL9540A, UN3536, UN38.3 |
| Public datasheet | yes | yes |
Where they differ
Only fields both manufacturers publish and where the values are not identical. Not a judgement — the right choice depends on the project.
- Max energy per enclosure: MC Cube-T Pro BESS — 8.576 MWh; 6.X Liquid Cooling Energy Storage System — 6.901 MWh
- Cell configuration: MC Cube-T Pro BESS — 2×6×1P416S (12-cube) / 2×8×1P416S (16-cube); 6.X Liquid Cooling Energy Storage System — 416S4P (10-ft) / 416S8P (20-ft)
- Form factor: MC Cube-T Pro BESS — modular block; 6.X Liquid Cooling Energy Storage System — 20 ft container
- DC voltage: MC Cube-T Pro BESS — 1081.6–1489.3; 1331.2 nominal V; 6.X Liquid Cooling Energy Storage System — 1081.6–1497.6 V
- Dimensions (L × W × H): MC Cube-T Pro BESS — 8815 × 2442 × 3170 mm; 6.X Liquid Cooling Energy Storage System — 6058 × 2438 × 2896 mm
- Fire suppression: MC Cube-T Pro BESS — perfluorohexanone gas suppression + water spray; 6.X Liquid Cooling Energy Storage System — Aerosol-based suppression system; flooded fire protection systems (options); fire alarm panel, heat and smoke detection, alarm bell and strobe
- Generation: MC Cube-T Pro BESS — MC Cube-T Pro (China market, A-series); 6.X Liquid Cooling Energy Storage System — 6.X (2026)
- Announced: MC Cube-T Pro BESS — 2024-04; 6.X Liquid Cooling Energy Storage System — 2026-01
- Certifications: MC Cube-T Pro BESS — GB 44240, GB/T 34131, GB/T 36276, GB/T 44026; 6.X Liquid Cooling Energy Storage System — IEC 61000, IEC 62477-1, IEC 62619, IEC 62933-5-2, IEC 63056, UL9540A, UN3536, UN38.3
Published by only one of the two: Max power per enclosure, Cell capacity, Weight.
Variants
BYD Energy Storage MC Cube-T Pro BESS variants
| Variants | Energy | Power | Duration |
|---|---|---|---|
| XH12C-B6012-A-R2 (6.0 MWh 2h) | 6.012 MWh | 3.006 MW | 2 h |
| XH12C-B6432-A-R4 (6.4 MWh 4h) | 6.432 MWh | 1.608 MW | 4 h |
| XH16C-B8016-A-R2 (8.0 MWh 2h) | 8.016 MWh | 4.008 MW | 2 h |
| XH16C-B8576-A-R4 (8.6 MWh 4h) | 8.576 MWh | 2.144 MW | 4 h |
CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage System variants
| Variants | Energy | Power | Duration |
|---|---|---|---|
| CESS-L3125-EU-0.5C — 3.125 MWh (10-ft, 587 Ah) | 3.125 MWh | not published | 2 h |
| CESS-L3125-EU-0.25C — 3.125 MWh (10-ft, 587 Ah) | 3.125 MWh | not published | 4 h |
| CESS-L3450-EU-0.5C — 3.450 MWh (10-ft, 648 Ah) | 3.45 MWh | not published | 2 h |
| CESS-L6250-EU-0.5C — 6.250 MWh (20-ft, 587 Ah) | 6.25 MWh | not published | 2 h |
| CESS-L6250-EU-0.25C — 6.250 MWh (20-ft, 587 Ah) | 6.25 MWh | not published | 4 h |
| CESS-L6901-EU-0.5C — 6.901 MWh (20-ft, 648 Ah) | 6.901 MWh | not published | 2 h |
Full model cards
Open BYD Energy Storage MC Cube-T Pro BESS →Open CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage System →
Other comparisons
Gotion High-Tech Gotion Grid 5 MWh (ESD1331-05P5015) vs CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage SystemGotion High-Tech Gotion Grid 5 MWh (ESD1331-05P5015) vs BYD Energy Storage MC Cube-T Pro BESSPylontech Container L5000-BAT vs CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage SystemPylontech Container L5000-BAT vs BYD Energy Storage MC Cube-T Pro BESSSunwoda Energy NoahX 2.0 (NoahX-1500/4170, NoahX-1500/5015-L2) vs CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage SystemSunwoda Energy NoahX 2.0 (NoahX-1500/4170, NoahX-1500/5015-L2) vs BYD Energy Storage MC Cube-T Pro BESSCATL TENER vs CRRC Zhuzhou Institute 6.X Liquid Cooling Energy Storage SystemCATL TENER vs BYD Energy Storage MC Cube-T Pro BESS