▮▮Coloprice

6 facilities · 6 operators · 102 MW tracked

Colocation in Astana: pricing, providers and capacity

6 operators run 6 tracked data centers in Astana (5 operational, 102+ MW published, 1 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Astana?

6 operators run 6 tracked data centers in Astana; the largest by sites is AKASHI Data Center PLC (1). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Astana publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Astana

Operators with tracked data centers in Astana, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
AKASHI Data Center PLC1 / 0100AKASHI Data Center 1Uptime Tier IV Design1
Kazteleport (Halyk Group)1 / 12Yereymentau Data CenterUptime Tier III Design, Uptime Tier III Constructed Facility, ISO 27001—
NAT Kazakhstan JSC1 / 1not publishedNAT Kazakhstan Data Centernot published—
National Bank of Kazakhstan1 / 1not publishedNational Bank of Kazakhstan Backup CenterUptime Institute Tier III Certification of Design Documents—
Transtelecom1 / 1not publishedNITEC Data CenterUptime Tier III Design, Uptime Tier III Constructed Facility—
Transtelecom (JSC Transtelecom)1 / 1not publishedNQZ Data Center TTCUptime Tier III Design—

Availability in Astana: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Astana?

By tracked sites: AKASHI Data Center PLC with 1. By published IT capacity: AKASHI Data Center PLC with 100 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Astana, including some that do not sell space.

Is there colocation capacity available in Astana right now?

Coloprice tracks 6 facilities here (5 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Astana?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.