7 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Astana: 7 facilities, colocation pricing
Colocation pricing and providers in Astana →
How many data centers are in Astana?
Coloprice tracks 7 data centers in Astana, Kazakhstan: 6 operational, 1 under construction and 0 announced, run by 7 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.090
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 6 Tier III/IV · 1 AI-ready · 102+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Astana, Kazakhstan | · · · | $0.090 | 7 | — |
| Uzbekistan | · · · | $0.093 | 10 | — |
| Kyrgyzstan | · · · | $0.050 | 4 | — |
| Ukraine | · · · | $0.185 | 32 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Astana?
Coloprice tracks 7 data centers in Astana, Kazakhstan: 6 operational, 1 under construction and 0 announced, run by 7 operators.
Which operators run data centers in Astana?
By number of facilities tracked: Kazteleport (Halyk Group) (1), Transtelecom (1), AKASHI Data Center PLC (1), Transtelecom (JSC Transtelecom) (1), NAT Kazakhstan JSC (1).
What is the total data center power capacity in Astana?
Facilities that publish capacity add up to 102 MW (2 of 7 sites disclose a figure); the largest published site is AKASHI Data Center 1 with 100 MW.
How much does colocation cost in Astana, Kazakhstan?
No published wholesale $/kW benchmark exists for Astana, Kazakhstan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Astana, Kazakhstan?
Commercial electricity in Astana, Kazakhstan is $0.090 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Astana, Kazakhstan?
On power alone, Kyrgyzstan ($0.050/kWh) run below Astana, Kazakhstan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Astana, Kazakhstan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Yereymentau Data Center | Kazteleport (Halyk Group) | 2 | III | Operational |
| NITEC Data Center | Transtelecom | — | III | Operational |
| AKASHI Data Center 1 | AKASHI Data Center PLC | 100 | IV | Under construction |
| NQZ Data Center TTC | Transtelecom (JSC Transtelecom) | — | III | Operational |
| NAT Kazakhstan Data Center | NAT Kazakhstan JSC | — | — | Operational |
| National Bank of Kazakhstan Backup Center | National Bank of Kazakhstan | — | III | Operational |
| JSC Transtelecom NITEC Data Center | JSC Transtelecom | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.