7 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Astana: 7 facilities, colocation pricing

Colocation pricing and providers in Astana →

How many data centers are in Astana?

Coloprice tracks 7 data centers in Astana, Kazakhstan: 6 operational, 1 under construction and 0 announced, run by 7 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.090

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 6 Tier III/IV · 1 AI-ready · 102+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Astana, Kazakhstan· · ·$0.0907—
Uzbekistan· · ·$0.09310—
Kyrgyzstan· · ·$0.0504—
Ukraine· · ·$0.18532—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Astana?

Coloprice tracks 7 data centers in Astana, Kazakhstan: 6 operational, 1 under construction and 0 announced, run by 7 operators.

Which operators run data centers in Astana?

By number of facilities tracked: Kazteleport (Halyk Group) (1), Transtelecom (1), AKASHI Data Center PLC (1), Transtelecom (JSC Transtelecom) (1), NAT Kazakhstan JSC (1).

What is the total data center power capacity in Astana?

Facilities that publish capacity add up to 102 MW (2 of 7 sites disclose a figure); the largest published site is AKASHI Data Center 1 with 100 MW.

How much does colocation cost in Astana, Kazakhstan?

No published wholesale $/kW benchmark exists for Astana, Kazakhstan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 7 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Astana, Kazakhstan?

Commercial electricity in Astana, Kazakhstan is $0.090 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 7 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Astana, Kazakhstan?

On power alone, Kyrgyzstan ($0.050/kWh) run below Astana, Kazakhstan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Astana, Kazakhstan market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Almaty vs Astana

Data centers

FacilityOperatorPower, MWTierStatus
Yereymentau Data CenterKazteleport (Halyk Group)2IIIOperational
NITEC Data CenterTranstelecom—IIIOperational
AKASHI Data Center 1AKASHI Data Center PLC100IVUnder construction
NQZ Data Center TTCTranstelecom (JSC Transtelecom)—IIIOperational
NAT Kazakhstan Data CenterNAT Kazakhstan JSC——Operational
National Bank of Kazakhstan Backup CenterNational Bank of Kazakhstan—IIIOperational
JSC Transtelecom NITEC Data CenterJSC Transtelecom—IIIOperational