Yereymentau Data Center
OperationalAbay Avenue 47A, Astana, Kazakhstan
Yereymentau Data Center is a data center (Uptime Tier III, constructed facility certified) in Astana, Kazakhstan, operated by Kazteleport (Halyk Group), with 2 MW of published IT capacity, currently operational, opened in 2024.
Kazteleport's Astana site, commissioned October 2024: a standalone building with 366 sqm of halls, 100 racks split between 7 kW and 14 kW densities and 2 MW of installed power on a 2N electrical design.

- Operator
- Kazteleport (Halyk Group)
- City
- Astana, Kazakhstan
- Power, MW
- 2 MW
- Cooling
- Air
- Uptime Tier
- III · constructed facility certified
- Opened
- 2024
- Floor space
- 366 m²
- Racks
- 100
- Max density
- 14 kW/rack
Coloprice Score
70 out of 100
Class B · #2 of 9 in Kazakhstan
- Resilience24/35
- Compliance12/20
- Transparency17/20
- Scale7/15
- Maturity10/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Despite the name — Yereymentau is a town in Akmola region — this facility sits in central Astana, at Abay Avenue 47A, and it is Kazteleport's answer to demand for certified capacity in the capital, where government agencies, banks and state-owned companies are concentrated. The operator publishes 366 sqm of machine hall, 100 racks and 2 MW of installed power, with the racks split by density: 80 provisioned at 7 kW and 20 at 14 kW. Electrical topology is 2N — two 2,500 kVA transformers, two diesel generators above 1.5 MW each, and 800 kW modular UPS units on lithium batteries with a 15-minute autonomy. Cooling is in-row precision with more than 1 MW of capacity and free cooling, held to ASHRAE limits. Construction was complicated by marshy ground and high groundwater, which forced additional foundation work. The site was commissioned in October 2024 and appears in the Uptime Institute register with both the Tier III design and constructed-facility awards, making it the first facility in Astana to complete the pair. For buyers, the relevant point is that certified capital-city capacity in Kazakhstan is still measured in hundreds of racks, not thousands.
- ▮Commissioned October 2024 in central Astana
- ▮100 racks across 366 sqm; 80 at 7 kW and 20 at 14 kW
- ▮2 MW installed on a 2N electrical design with lithium-battery UPS
- ▮First Astana facility with both Uptime Tier III awards
- ▮In-row precision cooling with free cooling, >1 MW capacity
Colocation pricing: Kazakhstan & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Astana
Source — Verified against operator sources · data pending on-site verification