Data centers in Barrie, ON: 3 facilities, colocation pricing

Colocation pricing and providers in Barrie, ON →

How many data centers are in Barrie, ON?

Coloprice tracks 3 data centers in Barrie, ON, Canada: 3 operational, 0 under construction and 0 announced, run by 3 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.115

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 10+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Barrie, ON, Canada· · ·$0.1153—
United States$196$0.1171344—
United Kingdom$213$0.454199—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Barrie, ON?

Coloprice tracks 3 data centers in Barrie, ON, Canada: 3 operational, 0 under construction and 0 announced, run by 3 operators.

Which operators run data centers in Barrie, ON?

By number of facilities tracked: eStruxture (1), Cogeco Data Services (1), BMO Financial Group (1).

What is the total data center power capacity in Barrie, ON?

Facilities that publish capacity add up to 10 MW (1 of 3 sites disclose a figure); the largest published site is eStruxture TOR-5 with 10 MW.

How much does colocation cost in Barrie, ON, Canada?

No published wholesale $/kW benchmark exists for Barrie, ON, Canada yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Barrie, ON, Canada?

Commercial electricity in Barrie, ON, Canada is $0.115 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Barrie, ON, Canada?

Barrie, ON, Canada sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Barrie, ON, Canada market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
eStruxture TOR-5eStruxture10—Operational
Cogeco Barrie Data CentreCogeco Data Services—IIIOperational
BMO Financial Group Barrie, Ontario Data CenterBMO Financial Group—IVOperational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.