3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Barrie, ON: 3 facilities, colocation pricing
Colocation pricing and providers in Barrie, ON →
How many data centers are in Barrie, ON?
Coloprice tracks 3 data centers in Barrie, ON, Canada: 3 operational, 0 under construction and 0 announced, run by 3 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.115
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 10+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Barrie, ON, Canada | · · · | $0.115 | 3 | — |
| United States | $196 | $0.117 | 1344 | — |
| United Kingdom | $213 | $0.454 | 199 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Barrie, ON?
Coloprice tracks 3 data centers in Barrie, ON, Canada: 3 operational, 0 under construction and 0 announced, run by 3 operators.
Which operators run data centers in Barrie, ON?
By number of facilities tracked: eStruxture (1), Cogeco Data Services (1), BMO Financial Group (1).
What is the total data center power capacity in Barrie, ON?
Facilities that publish capacity add up to 10 MW (1 of 3 sites disclose a figure); the largest published site is eStruxture TOR-5 with 10 MW.
How much does colocation cost in Barrie, ON, Canada?
No published wholesale $/kW benchmark exists for Barrie, ON, Canada yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Barrie, ON, Canada?
Commercial electricity in Barrie, ON, Canada is $0.115 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Barrie, ON, Canada?
Barrie, ON, Canada sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Barrie, ON, Canada market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| eStruxture TOR-5 | eStruxture | 10 | — | Operational |
| Cogeco Barrie Data Centre | Cogeco Data Services | — | III | Operational |
| BMO Financial Group Barrie, Ontario Data Center | BMO Financial Group | — | IV | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Canada
Colocation quotes in Barrie, ON: free, reply within one business day
Get Quotes →