2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Boucherville, QC: 2 facilities, colocation pricing

How many data centers are in Boucherville, QC?

Coloprice tracks 2 data centers in Boucherville, QC, Canada: 2 operational, 0 under construction and 0 announced, run by 2 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.115

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 1+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Boucherville, QC, Canada· · ·$0.1152—
United States$196$0.1171344—
United Kingdom$213$0.454199—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Boucherville, QC?

Coloprice tracks 2 data centers in Boucherville, QC, Canada: 2 operational, 0 under construction and 0 announced, run by 2 operators.

Which operators run data centers in Boucherville, QC?

By number of facilities tracked: eStruxture (1), Kolotek (1).

What is the total data center power capacity in Boucherville, QC?

Facilities that publish capacity add up to 1 MW (1 of 2 sites disclose a figure); the largest published site is eStruxture MTL-3 with 1.2 MW.

How much does colocation cost in Boucherville, QC, Canada?

No published wholesale $/kW benchmark exists for Boucherville, QC, Canada yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Boucherville, QC, Canada?

Commercial electricity in Boucherville, QC, Canada is $0.115 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Boucherville, QC, Canada?

Boucherville, QC, Canada sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Boucherville, QC, Canada market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
eStruxture MTL-3eStruxture1.2—Operational
K2 - BouchervilleKolotek—IIIOperational