1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Hradec Králové: 1 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.221
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Hradec Králové, Czech Republic | · · · | $0.221 | 1 | — |
| Germany | · · · | $0.269 | 122 | — |
| Austria | · · · | $0.302 | 13 | — |
| Poland | · · · | $0.177 | 27 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Hradec Králové, Czech Republic?
No published wholesale $/kW benchmark exists for Hradec Králové, Czech Republic yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Hradec Králové, Czech Republic?
Commercial electricity in Hradec Králové, Czech Republic is $0.221 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Hradec Králové, Czech Republic?
On power alone, Poland ($0.177/kWh) run below Hradec Králové, Czech Republic. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Hradec Králové, Czech Republic market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| CETIN HC TKB Hradec Králové | CETIN | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.