Cloud9 Tbilisi Data Center
Operational2 Akaki Tsereteli Ave., Dinamo Stadium, Gate 5, Tbilisi 0112, Georgia
Cloud9 Tbilisi Data Center is a data center (Uptime Tier III, self-declared) in Tbilisi, Georgia, operated by Cloud9, currently operational.
Carrier-neutral colocation facility at the Dinamo Arena complex in central Tbilisi, operating its own internet exchange point with 250 Gbps of total interconnection capacity; three independent substations and a 630 kVA generator, Tier 3 by operator description only.

- Operator
- Cloud9
- City
- Tbilisi, Georgia
- Power, MW
- —
- Cooling
- Air
- Uptime Tier
- III · self-declared
Coloprice Score
20 out of 100
Class E · #1 of 3 in Georgia
- Resilience11/35
- Compliance0/20
- Transparency2/20
- Scale0/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Cloud9 runs the colocation and hosting facility inside the Dinamo Arena complex in central Tbilisi, and it is one of the few Georgian sites where the operator publishes a real technical description. Power comes from three independent substations backed by a 630 kVA diesel generator, with the colocation zone fed on an N+N redundant supply through UPS. Cooling is direct-expansion HVAC with temperature and humidity monitoring; server rooms have no windows or external walls, and the only plumbing nearby serves the fire-suppression system, which uses 3M Novec 1230 clean agent behind early smoke, heat and fire detection. Access is biometric throughout, the premises are guarded by the Georgian State Security Agency, and the building is stated to comply with seismic standards — material in a country where earthquake exposure is real. The commercially distinctive feature is interconnection: Cloud9 is carrier-neutral, operates an internet exchange point, and connects to all leading Georgian carriers and to smaller ISPs over reserved dark fibre on several alternative routes, with total interconnection capacity of 250 Gbps. Note the certification position carefully: the operator describes its infrastructure as Tier 3 and explains the Uptime Institute classification on its own page, but does not claim an Uptime certificate. IT load, floor area and rack inventory are not published, and colocation is quoted on request.
- ▮Carrier-neutral facility at Dinamo Arena, central Tbilisi; also an IXP operator
- ▮250 Gbps total interconnection capacity over reserved dark fibre on multiple routes
- ▮Three independent substations, 630 kVA diesel generator, N+N feed in the colocation zone
- ▮DX cooling; 3M Novec 1230 clean-agent fire suppression; biometric access
- ▮Tier 3 by operator description — no Uptime Institute certificate claimed
Colocation pricing: Georgia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Tbilisi
Source — Verified against operator sources · data pending on-site verification